These supplemental specifications are approved for use in the development of CFLHD projects using the FP-14. The FLH Supplement specifications are included within these supplements. To view/download specific supplemental specifications in MS Word format, select the appropriate link below.
NOTE: As files are often updated, it may be necessary to refresh your browser and/or clear your browser history cache to view the most current documents. It is recommended that files be saved to your computer then opened to ensure the most current file is viewed.
100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700
Miscellaneous Files
|
Section |
Description |
Revised |
– |
Single Word Document FP-14 LOS |
5/30/2025 |
– |
Record of Specification Changes FP-14 (XLSX) |
5/30/2025 |
– |
SCR Starter Page FP-14 |
7/12/2022 |
Division 100 – GENERAL REQUIREMENTS
|
Section |
Description |
Revised |
101 |
Terms, Format, and Definitions |
5/20/2025 |
102 |
Bid, Award, and Execution of Contract |
9/11/2014 |
103 |
Scope of Work |
4/12/2023 |
104 |
Control of Work |
5/20/2025 |
105 |
Control of Material |
10/2/2019 |
106 |
Acceptance of Work |
4/2/2018 |
107 |
Legal Relations and Responsibility to the Public |
5/30/2025 |
107A |
Indian Preference |
5/4/2021 |
108 |
Prosecution and Progress |
5/20/2025 |
109 |
Measurement and Payment |
5/20/2025 |
Division 150 – PROJECT REQUIREMENTS
|
Section |
Description |
Revised |
152 |
Construction Survey and Staking |
5/30/2025 |
153 |
Contractor Quality Control |
5/20/2025 |
154 |
Contractor Sampling and Testing |
9/11/2014 |
155 |
Schedules for Construction Contracts |
6/13/2019 |
156 |
Public Traffic |
8/26/2024 |
157 |
Soil Erosion and Sediment Control |
8/26/2024 |
Division 200 – EARTHWORK
|
Section |
Description |
Revised |
203 |
Removal of Structures and Obstructions |
9/30/2017 |
204 |
Excavation and Embankment |
8/1/2014 |
207 |
Earthwork Geotextiles |
8/26/2024 |
211 |
Roadway Obliteration |
8/26/2024 |
Division 250 – SLOPE REINFORCEMENT AND RETAINING WALLS
|
Section |
Description |
Revised |
252 |
Rockery, Special Rock Embankment, and Rock Buttress |
8/26/2024 |
253 |
Gabions and Revet Mattresses |
8/26/2024 |
255 |
Mechanically Stabilized Earth Walls |
8/26/2024 |
258 |
Reinforced Concrete Retaining Walls |
8/26/2024 |
261 |
Reinforced Soil Slopes |
8/26/2024 |
Division 300 – AGGREGATE AND BASE COURSES
|
Section |
Description |
Revised |
301 |
Untreated Aggregate Courses |
6/13/2019 |
302 |
Minor Crushed Aggregate |
5/4/2021 |
304 |
Full Depth Reclamation |
2/2/2023 |
310 |
Cold In-Place Recycled Asphalt Base Course |
8/1/2014 |
Division 400 – ASPHALT PAVEMENTS AND SURFACE TREATMENTS
|
Section |
Description |
Revised |
401 |
Asphalt Concrete Pavement by Gyratory Mix Design Method |
10/2/2019 |
402 |
Asphalt Concrete Pavement by Hveem or Marshall Mix Design Method |
4/1/2020 |
403 |
Asphalt Concrete |
4/1/2020 |
404 |
Asphalt Concrete Pavement Warranty |
3/22/2022 |
407 |
Chip Seal |
8/1/2014 |
Division 500 – RIGID PAVEMENTS
|
Section |
Description |
Revised |
502 |
Concrete Pavement Restoration |
7/5/2016 |
503 |
Concrete Pavement Warranty |
3/22/2022 |
Division 550 – BRIDGE CONSTRUCTION
|
Section |
Description |
Revised |
552 |
Structural Concrete |
8/26/2024 |
555 |
Steel Structures |
8/26/2024 |
563 |
Painting |
6/13/2019 |
564 |
Bearing Devices |
4/12/2023 |
565 |
Drilled Shafts |
8/1/2014 |
568 |
High Performance Concrete |
11/5/2015 |
569 |
Concrete Overlays For Bridge Decks |
11/5/2015 |
Division 600 – INCIDENTAL CONSTRUCTION
|
Section |
Description |
Revised |
601 |
Minor Concrete Structures |
5/12/2015 |
602 |
Culverts and Drains |
5/30/2025 |
603 |
Structural Plate Structures |
5/12/2015 |
609 |
Curb and Gutter |
5/30/2025 |
615 |
Sidewalks, Pads, and Paved Medians |
5/30/2025 |
617 |
Guardrail |
6/13/2019 |
623 |
General Labor |
5/30/2025 |
625 |
Turf Establishment |
5/4/2021 |
629 |
Rolled Erosion Control Products and Cellular Confinement Systems |
8/1/2014 |
633 |
Permanent Traffic Control |
7/31/2017 |
634 |
Permanent Pavement Markings |
3/22/2022 |
635 |
Temporary Traffic Control |
4/1/2020 |
636 |
Traffic Signal, Traffic Counter, Lighting, and Electrical Systems |
6/13/2019 |
637 |
Facilities and Services |
2/25/2025 |
650 |
Construct and Maintain Diversion |
8/26/2024 |
Division 700 – MATERIAL
|
Section |
Description |
Revised |
702 |
Asphalt Material |
8/26/2024 |
703 |
Aggregate |
9/11/2014 |
704 |
Soil |
9/11/2014 |
705 |
Rock |
2/15/2019 |
706 |
Concrete and Plastic Pipe |
8/1/2014 |
708 |
Plastic Pipe |
5/30/2025 |
710 |
Fence and Guardrail |
3/22/2022 |
713 |
Roadside Improvement Material |
8/26/2024 |
718 |
Traffic Signing and Marking Material |
8/1/2014 |
725 |
Miscellaneous Material |
4/12/2023 |
Misc - 100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700
Last updated: Wednesday, June 4, 2025