FP-24 CFL Library of Supplemental Specifications
These supplemental specifications are approved for use in the development of CFLHD projects using the FP-24. The FLH Supplement specifications are included within these supplements. To view/download specific supplemental specifications in MS Word format, select the appropriate link below.
100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700
Miscellaneous Files |
||
| Section | Description | Revised |
|---|---|---|
| – | Single Word Document FP-24 LOS | 10/06/2025 |
| – | Record of Specification Changes FP-24 (XLSX) | 10/06/2025 |
| – | SCR Starter Page FP-24 | 2/25/2025 |
Division 100 – GENERAL REQUIREMENTS |
||
| Section | Description | Revised |
| 101 | Terms, Format, and Definitions | 5/20/2025 |
| 102 | Bid, Award, and Execution of Contract | 10/06/2025 |
| 104 | Control of Work | 5/30/2025 |
| 105 | Control of Material | 2/25/2025 |
| 106 | Acceptance of Work | 10/06/2025 |
| 107 | Legal Relations and Responsibility to the Public | 5/30/2025 |
| 107A | Indian Preference | 8/18/2025 |
| 108 | Prosecution and Progress | 10/06/2025 |
| 109 | Measurement and Payment | 10/06/2025 |
Division 150 – PROJECT REQUIREMENTS |
||
| Section | Description | Revised |
| 152 | Construction Survey and Staking | 10/06/2025 |
| 153 | Contractor Quality Control | 5/20/2025 |
| 154 | Contractor Sampling and Testing | 2/25/2025 |
| 155 | Schedules for Construction Contracts | 2/25/2025 |
| 156 | Public Traffic | 2/25/2025 |
| 157 | Soil Erosion and Sediment Control | 2/25/2025 |
Division 200 – EARTHWORK |
||
| Section | Description | Revised |
| 203 | Removal of Structures and Obstructions | 2/25/2025 |
| 204 | Excavation and Embankment | 5/30/2025 |
| 207 | Earthwork Geosynthetics | 2/25/2025 |
| 211 | Roadway Obliteration | 2/25/2025 |
Division 250 – EARTH RETAINING SYSTEMS AND SLOPES |
||
| Section | Description | Revised |
| 252 | Rockery, Special Rock Embankment, and Rock Buttress | 2/25/2025 |
| 255 | Mechanically-Stabilized Earth Walls | 2/25/2025 |
| 258 | Reinforced Concrete Retaining Walls | 2/25/2025 |
Division 300 – AGGREGATE AND BASE COURSES |
||
| Section | Description | Revised |
| 301 | Untreated Aggregate Courses | 8/18/2025 |
| 302 | Crushed Aggregate | 2/25/2025 |
| 304 | Full Depth Reclamation | 2/25/2025 |
| 310 | Cold In-Place Recycled Asphalt Base Course | 2/25/2025 |
Division 400 – ASPHALT PAVEMENTS AND SURFACE TREATMENTS |
||
| Section | Description | Revised |
| 401 | Asphalt Concrete Pavement by Gyratory Mix Design Method | 2/25/2025 |
| 402 | Asphalt Concrete Pavement by Hveem or Marshall Mix Design Method | 2/25/2025 |
| 403 | Asphalt Concrete | 2/25/2025 |
| 407 | Chip Seal | 2/25/2025 |
| 431 | Asphalt Concrete Pavement Warranty | 2/25/2025 |
Division 500 – RIGID PAVEMENTS |
||
| Section | Description | Revised |
| 501 | Minor Concrete Pavement | 2/25/2025 |
| 510 | Concrete Pavement Warranty | 2/25/2025 |
Division 550 – BRIDGE CONSTRUCTION |
||
| Section | Description | Revised |
| 552 | Structural Concrete | 2/25/2025 |
| 554 | Reinforcing Steel | 2/25/2025 |
| 555 | Steel Structures | 5/30/2025 |
| 560 | Removal of Concrete by Hydrodemolition | 3/12/2025 |
| 563 | Coating | 2/25/2025 |
| 564 | Bearing Devices | 2/25/2025 |
| 565 | Drilled Shafts | 2/25/2025 |
| 572 | Concrete Repair | 2/25/2025 |
| 578 | Precast Concrete Elements | 8/18/2025 |
Division 600 – INCIDENTAL CONSTRUCTION |
||
| Section | Description | Revised |
| 601 | Minor Concrete | 2/25/2025 |
| 602 | Culverts and Drains | 5/30/2025 |
| 609 | Curb and Gutter | 5/30/2025 |
| 610 | Sidewalks, Pads, and Medians | 5/30/2025 |
| 617 | Guardrail | 2/25/2025 |
| 623 | General Labor | 5/30/2025 |
| 625 | Turf Establishment | 2/25/2025 |
| 628 | Temporary Stream Diversions | 2/25/2025 |
| 633 | Permanent Traffic Control | 2/25/2025 |
| 634 | Permanent Pavement Markings | 2/25/2025 |
| 635 | Temporary Traffic Control | 2/25/2025 |
| 636 | Traffic Signal, Traffic Counter, Lighting, and Electrical Systems | 2/25/2025 |
| 637 | Facilities and Services | 5/30/2025 |
| 650 | Temporary Traffic Diversions | 2/25/2025 |
Division 700 – MATERIAL |
||
| Section | Description | Revised |
| 701 | Cementitious Material | 2/25/2025 |
| 702 | Asphalt Material and Additives | 2/25/2025 |
| 703 | Aggregate | 8/18/2025 |
| 704 | Soil | 2/25/2025 |
| 708 | Plastic Pipe | 5/30/2025 |
| 712 | Joint Material | 2/25/2025 |
| 713 | Roadside Improvement Material | 2/25/2025 |
| 714 | Geosynthetic Material | 5/30/2025 |
| 725 | Miscellaneous Material | 10/06/2025 |
Misc - 100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700