FP-24 CFL Library of Supplemental Specifications
These supplemental specifications are approved for use in the development of CFLHD projects using the FP-24. The FLH Supplement specifications are included within these supplements. To view/download specific supplemental specifications in MS Word format, select the appropriate link below.
100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700
Miscellaneous Files |
||
Section | Description | Revised |
---|---|---|
– | Single Word Document FP-24 LOS | 8/26/2024 |
– | Record of Specification Changes FP-24 (XLSX) | 8/26/2024 |
– | SCR Starter Page FP-24 | 4/9/2024 |
Division 100 – GENERAL REQUIREMENTS |
||
Section | Description | Revised |
101 | Terms, Format, and Definitions | 4/9/2024 |
102 | Bid, Award, and Execution of Contract | 4/9/2024 |
105 | Control of Material | 4/9/2024 |
106 | Acceptance of Work | 4/9/2024 |
107 | Legal Relations and Responsibility to the Public | 8/26/2024 |
107A | Indian Preference | 4/9/2024 |
108 | Prosecution and Progress | 4/9/2024 |
109 | Measurement and Payment | 8/26/2024 |
Division 150 – PROJECT REQUIREMENTS |
||
Section | Description | Revised |
152 | Construction Survey and Staking | 8/26/2024 |
153 | Contractor Quality Control | 4/9/2024 |
154 | Contractor Sampling and Testing | 4/9/2024 |
155 | Schedules for Construction Contracts | 4/9/2024 |
156 | Public Traffic | 4/9/2024 |
157 | Soil Erosion and Sediment Control | 8/26/2024 |
Division 200 – EARTHWORK |
||
Section | Description | Revised |
203 | Removal of Structures and Obstructions | 4/9/2024 |
204 | Excavation and Embankment | 4/9/2024 |
207 | Earthwork Geosynthetics | 4/9/2024 |
211 | Roadway Obliteration | 4/9/2024 |
Division 250 – EARTH RETAINING SYSTEMS AND SLOPES |
||
Section | Description | Revised |
252 | Rockery, Special Rock Embankment, and Rock Buttress | 8/26/2024 |
255 | Mechanically-Stabilized Earth Walls | 8/26/2024 |
258 | Reinforced Concrete Retaining Walls | 4/9/2024 |
Division 300 – AGGREGATE AND BASE COURSES |
||
Section | Description | Revised |
301 | Untreated Aggregate Courses | 4/9/2024 |
302 | Crushed Aggregate | 4/9/2024 |
304 | Full Depth Reclamation | 4/9/2024 |
310 | Cold In-Place Recycled Asphalt Base Course | 4/9/2024 |
Division 400 – ASPHALT PAVEMENTS AND SURFACE TREATMENTS |
||
Section | Description | Revised |
401 | Asphalt Concrete Pavement by Gyratory Mix Design Method | 4/9/2024 |
402 | Asphalt Concrete Pavement by Hveem or Marshall Mix Design Method | 4/9/2024 |
403 | Asphalt Concrete | 4/9/2024 |
407 | Chip Seal | 4/9/2024 |
431 | Asphalt Concrete Pavement Warranty | 4/9/2024 |
Division 500 – RIGID PAVEMENTS |
||
Section | Description | Revised |
510 | Concrete Pavement Warranty | 4/9/2024 |
Division 550 – BRIDGE CONSTRUCTION |
||
Section | Description | Revised |
552 | Structural Concrete | 8/26/2024 |
555 | Steel Structures | 8/26/2024 |
563 | Coating | 4/9/2024 |
564 | Bearing Devices | 4/9/2024 |
565 | Drilled Shafts | 4/9/2024 |
Division 600 – INCIDENTAL CONSTRUCTION |
||
Section | Description | Revised |
601 | Minor Concrete | 8/26/2024 |
609 | Curb and Gutter | 4/9/2024 |
617 | Guardrail | 4/9/2024 |
623 | General Labor | 4/9/2024 |
625 | Turf Establishment | 4/9/2024 |
628 | Temporary Stream Diversions | 8/26/2024 |
633 | Permanent Traffic Control | 4/9/2024 |
634 | Permanent Pavement Markings | 4/9/2024 |
635 | Temporary Traffic Control | 4/9/2024 |
636 | Traffic Signal, Traffic Counter, Lighting, and Electrical Systems | 4/9/2024 |
637 | Facilities and Services | 8/26/2024 |
650 | Temporary Traffic Diversions | 4/9/2024 |
Division 700 – MATERIAL |
||
Section | Description | Revised |
701 | Cementitious Material | 4/9/2024 |
702 | Asphalt Material and Additives | 4/9/2024 |
703 | Aggregate | 4/9/2024 |
704 | Soil | 4/9/2024 |
713 | Roadside Improvement Material | 4/9/2024 |
714 | Geosynthetic Material | 8/26/2024 |
725 | Miscellaneous Material | 4/9/2024 |
Misc - 100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700