FP-14 EFL Library of Supplemental Specifications
These supplemental specifications are approved for use in the development of Special Contract Requirements (SCRs) for EFLHD projects using the FP-14. The FLH supplemental specifications are included within the FP-14 LOS when they are approved by the FLH Specifications Coordination Group (SCG).
To view/download specific supplemental specifications in Microsoft Word format, select the appropriate link below.
All FP-14 LOS documents are in US Customary unit format. The entire set of FP-14 supplemental specifications may be downloaded as a single Word document file.
100 - 150 - 200 - 300 - 400 - 550 - 600 - 700
Miscellaneous Files |
||
Section | Description | Revised |
---|---|---|
– | Single Word Document | 9/12/2024 |
Division 100 – GENERAL REQUIREMENTS |
||
Section | Description | Revised |
104 | Control of Work | 6/22/2016 |
106 | Acceptance of Work | 3/25/2015 |
108 | Prosecution and Progress | 5/12/2016 |
109 | Measurement and Payment | 6/16/2022 |
109.06A/B | Measurement and Payment - Asphalt Binder and Fuel Price Adjustment Provisions (DRAFT) | 8/31/2022 |
Division 150 – PROJECT REQUIREMENTS |
||
Section | Description | Revised |
152 | Construction Survey and Staking | 6/16/2022 |
154 | Contractor Sampling and Testing | 11/17/2020 |
155 | Schedules for Construction Contracts | 4/13/2023 |
156 | Public Traffic | 6/22/2016 |
157 | Soil Erosion and Sediment Control | 6/22/2016 |
Division 200 – EARTHWORK |
||
Section | Description | Revised |
203 | Removal of Structures and Obstructions | 5/12/2016 |
Division 300 – AGGREGATE AND BASE COURSES |
||
Section | Description | Revised |
301 | Untreated Aggregate Courses | 11/17/2020 |
Division 400 – ASPHALT PAVEMENTS AND SURFACE TREATMENTS |
||
Section | Description | Revised |
401 | Asphalt Concrete Pavement by Gyratory Mix Design Method | 2/18/2016 |
402 | Asphalt Concrete Pavement by Hveem or Marshall Mix | 2/18/2016 |
412 | Asphalt Tack Coat | 1/25/2018 |
414 | Asphalt Pavement Crack Sealing and Filling | 9/28/2017 |
Division 550 – BRIDGE CONSTRUCTION |
||
Section | Description | Revised |
552 | Structural Concrete | 5/12/2016 |
Division 600 – INCIDENTAL CONSTRUCTION |
||
Section | Description | Revised |
615 | Sidewalks, Pads, and Medians | 2/18/2016 |
617 | Guardrail | 5/12/2021 |
634 | Permanent Pavement Markings | 6/16/2022 |
635 | Temporary Traffic Control | 1/11/2018 |
636 | Traffic Signal, Traffic Counter, Lighting, and Electrical Systems | 5/25/2022 |
637/1 | Facilities and Services – Contractor Supplied | 5/7/2018 |
637/2 | Facilities and Services – Government Provided | 5/7/2018 |
637/3 | Facilities and Services – Miscellaneous Equipment | 5/7/2018 |
645 | Locating Utilities | 5/26/2016 |
Division 700 – MATERIAL |
||
Section | Description | Revised |
702 | Asphalt Materials | 11/23/2020 |
703 | Aggregate | 11/30/2020 |
712 | Joint Material | 9/28/2017 |
718 | Traffic Signing and Marking Material | 2/18/2016 |
721 | Electrical and Illumination Material | 5/25/2022 |