FP-14 WFL Library of Supplemental Specifications
These supplemental specifications are approved for use in the development of Special Contract Requirements (SCR) for WFLHD projects using the FP-14. The FLH Supplement specifications are included within these supplements. Select from the appropriate links below to view/download specific supplemental specifications in MSWord format.
- Instructions for Assembling SCR Documents - information about the supplemental specification documents and how to assemble the SCR package using MS Word.
- Download all supplemental specifications (ZIP 3,117 KB)
100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700
Miscellaneous Files |
||
Section | Description | Revised |
---|---|---|
– | Specification Revisions | 11/1/2024 |
– | LOS definitions for NTB, 102, and 108 | 11/12/2020 |
– | Notice to Bidders/Offerors (includes Solicitation TOC) | 11/1/2024 |
– | SCR Review Title Page (for reviews only) | 8/1/2014 |
– | SCR Template (w/ SCR TOC) | 2/9/2024 |
– | Sections H, I, & J | 6/15/2022 |
Division 100 – GENERAL REQUIREMENTS |
||
Section | Description | Revised |
101 | Terms, Format, and Definitions | 11/8/2021 |
102 | Bid, Award, and Execution of Contract | 2/9/2024 |
103 | Scope of Work | 4/3/2020 |
104 | Control of Work | 7/1/2024 |
105 | Control of Material | 4/2/2021 |
106 | Acceptance of Work | 7/1/2024 |
107 | Legal Relations and Responsibility to the Public | 11/1/2024 |
107A | Indian Preference | 4/2/2021 |
108 | Prosecution and Progress | 11/1/2024 |
109 | Measurement and Payment | 6/15/2022 |
Division 150 – PROJECT REQUIREMENTS |
||
Section | Description | Revised |
151 | Mobilization | 9/17/2018 |
152 | Construction Survey and Staking | 7/1/2024 |
153 | Contractor Quality Control | 4/2/2021 |
154 | Contractor Sampling and Testing | 6/15/2022 |
155 | Schedules for Construction Contracts | 1/6/2023 |
156 | Public Traffic | 1/6/2023 |
157 | Soil Erosion and Sediment Control | 1/6/2023 |
Division 200 – EARTHWORK |
||
Section | Description | Revised |
201 | Clearing and Grubbing | 1/1/2014 |
204 | Excavation and Embankment | 11/12/2020 |
208 | Structure Excavation and Backfill for Selected Major Structures | 4/3/2020 |
Division 250 – SLOPE REINFORCEMENT AND RETAINING WALLS |
||
Section | Description | Revised |
251 | Riprap | 11/5/2015 |
252 | Rockery, Special Rock Embankment, and Rock Buttress | 11/12/2020 |
253 | Gabions and Revet Mattresses | 9/17/2018 |
255 | Mechanically-Stabilized Earth Walls | 9/17/2018 |
257 | Contractor-Designed Retaining Walls | 9/17/2018 |
270 | Compaction Grouting (Template) | 8/1/2014 |
271 | Geotechnical Exploration (Template) | 8/1/2014 |
273 | Polyurethane Resin Injection (Template) | 8/1/2014 |
274 | Vibro Columns (Template) | 8/1/2014 |
275 | Geofoam (Template) | 8/1/2014 |
Division 300 – AGGREGATE AND BASE COURSES |
||
Section | Description | Revised |
301 | Untreated Aggregate Courses | 4/2/2021 |
302 | Minor Crushed Aggregate | 4/2/2021 |
307 | Cement Treated Aggregate Course (Template) | 8/1/2014 |
308 | Recycled Aggregate Base | 4/2/2021 |
309 | Emulsified Asphalt-Treated Base Course | 11/8/2021 |
310 | Cold In-Place Recycled Asphalt Base Course | 3/31/2016 |
311 | Stabilized Aggregate Surface Course | 11/1/2024 |
313 | Aggregate-Topsoil Course | 8/1/2014 |
Division 400 – ASPHALT PAVEMENTS AND SURFACE TREATMENTS |
||
Section | Description | Revised |
401 | Asphalt Concrete Pavement by Gyratory Mix Design Method | 7/1/2024 |
402 | Asphalt Concrete Pavement by HVEEM or Marshall Mix Design Method | 7/20/2015 |
403 | Asphalt Concrete | 11/5/2015 |
407 | Chip Seal | 8/1/2014 |
408 | Cold Recycled Asphalt Base Course | 4/2/2021 |
409 | Micro Surfacing | 8/1/2014 |
410 | Slurry Seal | 8/1/2014 |
429 | Bonded Wearing Course (Template) | 8/1/2014 |
Division 500 – RIGID PAVEMENTS |
||
Section | Description | Revised |
501 | Minor Concrete Pavement | 4/2/2021 |
502 | Concrete Pavement Restoration | 3/31/2016 |
Division 550 – BRIDGE CONSTRUCTION |
||
Section | Description | Revised |
552 | Structural Concrete | 11/8/2021 |
553 | Prestressed Concrete | 7/21/2017 |
554 | Reinforcing Steel | 8/1/2014 |
555 | Steel Structures | 11/1/2024 |
562 | Temporary Works | 8/1/2019 |
563 | Painting | 1/6/2023 |
564 | Bearings | 11/5/2015 |
565 | Drilled Shafts | 4/2/2021 |
568 | High Performance Concrete | 7/20/2015 |
569 | Concrete Overlays for Bridge Decks | 7/20/2015 |
574 | Geosynthetic Reinforced Soil Integrated Bridge System (Template) | 8/1/2014 |
575 | Minor Bridge Work (Template) | 8/1/2014 |
576 | Pile Encapsulation (Template) | 8/1/2014 |
577 | Plastic Structures (Template) | 8/1/2014 |
580 | Alternate Bridge (Template) | 8/1/2014 |
581 | Structural Cable Systems (Template) | 8/1/2014 |
582 | Helical Piles (Template) | 8/1/2014 |
583 | Carbon Fiber Reinforced Polymer (Template) | 4/3/2020 |
584 | Glass Fiber Reinforced Polymer (Template) | 4/3/2020 |
585 | Ultra High Performce Concrete (Template) | 4/3/2020 |
586 | Precast Segmental Concrete (Template) | 4/2/2021 |
587 | Post-Tensioning System (Template) | 4/2/2021 |
Division 600 – INCIDENTAL CONSTRUCTION |
||
Section | Description | Revised |
602 | Culverts and Drains | 6/15/2022 |
603 | Structural Plate Structures | 7/20/2015 |
611 | Water Systems | 8/1/2014 |
612 | Sanitary Sewer Systems | 8/1/2014 |
613 | Simulated Stone Masonry Surface | 11/12/2020 |
617 | Guardrail | 7/1/2024 |
622 | Rental Equipment | 8/1/2014 |
623 | General Labor | 8/1/2014 |
625 | Turf Establishment | 8/1/2014 |
633 | Permanent Traffic Control | 8/1/2014 |
634 | Permanent Pavement Markings | 4/2/2021 |
635 | Temporary Traffic Control | 7/1/2024 |
636 | Traffic Signal, Traffic Counter, Lighting, and Electrical Systems | 8/1/2014 |
637 | Facilities and Services | 8/1/2014 |
645 | Locating Utilities (Template) | 8/1/2014 |
646 | Roadside Development (Template) | 8/1/2014 |
647 | Environmental Mitigation (Template) | 8/1/2014 |
648 | Pipeline Energy Utilities (Template) | 8/1/2014 |
650 | Temporary Diversions Template) | 8/1/2014 |
651 | Rockfall Protection (Template) | 8/1/2014 |
652 | Railroad Work (Template) | 8/1/2014 |
653 | Midslope Rockfall Attenuator (Template) | 4/3/2020 |
654 | Draped Rockfall Protection (Template) | 4/3/2020 |
655 | Anchored Wire Mesh System (Template) | 4/3/2020 |
656 | Temporary Rockfall Projection (Template) | 4/3/2020 |
Division 700 – MATERIAL |
||
Section | Description | Revised |
702 | Asphalt Material | 7/15/2016 |
703 | Aggregate | 7/1/2024 |
704 | Soil | 4/2/2021 |
705 | Rock | 8/1/2019 |
708 | Plastic Pipe | 8/1/2014 |
709 | Reinforcing Steel and Wire Rope | 11/8/2021 |
710 | Fence and Guardrail | 7/19/2019 |
712 | Joint Material | 11/5/2015 |
713 | Roadside Improvement Material | 11/8/2021 |
716 | Material for Timber Structures | 8/1/2014 |
717 | Structural Metal | 7/21/2017 |
719 | Paint | 6/15/2022 |
722 | Anchor Material | 1/6/2023 |
725 | Miscellaneous Material | 11/1/2024 |
Misc - 100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700