FP-24 WFL Library of Supplemental Specifications
These supplemental specifications will be used in the development of Special Contract Requirements (SCR) for WFLHD projects using the FP-24. The FLH Supplement specifications are included within these supplements. Select from the appropriate links below to view/download specific supplemental specifications in MSWord format.
- Instructions for Assembling SCR Documents - information about the supplemental specification documents and how to assemble the SCR package using MS Word.
100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700
Miscellaneous Files |
||
| Section | Description | Revised |
|---|---|---|
| – | Specification Revisions ![]() |
10/6/2025 |
| – | LOS definitions for NTB, 102, and 108 | 4/1/2024 |
| – | Notice to Bidders/Offerors (includes Solicitation TOC) ![]() |
10/6/2025 |
| – | SCR Review Title Page (for reviews only) | 4/1/2024 |
| – | SCR Template (w/ SCR TOC) | 4/1/2024 |
| – | Sections H and I | 4/1/2024 |
Division 100 – GENERAL REQUIREMENTS |
||
| Section | Description | Revised |
| 101 | Terms, Format and Definitions | 4/1/2025 |
| 102 | Bid, Award, and Execution of Contract ![]() |
10/6/2025 |
| 103 | Scope of Work | 4/1/2024 |
| 104 | Control of Work ![]() |
10/6/2025 |
| 105 | Control of Material | 4/1/2025 |
| 106 | Acceptance of Work ![]() |
10/6/2025 |
| 107 | Legal Relations and Responsibility to the Public ![]() |
10/6/2025 |
| 107A | Indian Preference | 4/1/2024 |
| 108 | Prosecution and Progress ![]() |
10/6/2025 |
| 109 | Measurement and Payment ![]() |
10/6/2025 |
Division 150 – PROJECT REQUIREMENTS |
||
| Section | Description | Revised |
| 151 | Mobilization | 4/1/2024 |
| 152 | Construction Survey and Staking ![]() |
10/6/2025 |
| 153 | Contractor Quality Control | 4/1/2024 |
| 154 | Contractor Sampling and Testing | 4/1/2024 |
| 155 | Schedules for Construction Contracts ![]() |
10/6/2025 |
| 156 | Public Traffic | 4/1/2025 |
| 157 | Soil Erosion and Sediment Control | 4/1/2024 |
Division 200 – EARTHWORK |
||
| Section | Description | Revised |
| 201 | Clearing and Grubbing | 4/1/2024 |
| 204 | Excavation and Embankment | 4/1/2025 |
| 208 | Structure Excavation and Backfill for Selected Major Structures | 4/1/2024 |
Division 250 – EARTH RETAINING SYSTEMS AND SLOPES |
||
| Section | Description | Revised |
| 251 | Riprap | 4/1/2024 |
| 255 | Mechanically-Stabilized Earth Walls | 11/1/2024 |
| 269 | Temporary Rockfall Protection (Template) | 4/1/2024 |
| 270 | Compaction Grouting (Template) | 4/1/2024 |
| 271 | Geotechnical Exploration (Template) | 4/1/2024 |
| 273 | Polyurethane Resin Injection (Template) | 4/1/2024 |
| 274 | Vibro Columns (Template) | 4/1/2024 |
| 275 | Geofoam (Template) | 4/1/2024 |
Division 300 – AGGREGATE AND BASE COURSES |
||
| Section | Description | Revised |
| 301 | Untreated Aggregate Courses | 4/1/2024 |
| 302 | Crushed Aggregate | 4/1/2024 |
| 307 | Cement Treated Aggregate Course (Template) | 4/1/2024 |
| 308 | Emulsified Asphalt-Treated Base Course | 4/1/2024 |
| 310 | Cold In-Place Recycled Asphalt Base Course | 4/1/2024 |
| 311 | Stabilized Aggregate Surface Course | 11/1/2024 |
| 313 | Aggregate-Topsoil Course | 4/1/2024 |
Division 400 – ASPHALT PAVEMENTS AND SURFACE TREATMENTS |
||
| Section | Description | Revised |
| 401 | Asphalt Concrete Pavement by Gyratory Mix Design Method | 4/1/2024 |
Division 500 – RIGID PAVEMENTS |
||
| Section | Description | Revised |
| 501 | Concrete Pavement | 4/1/2025 |
Division 550 – BRIDGE CONSTRUCTION |
||
| Section | Description | Revised |
| 552 | Structural Concrete | 4/1/2024 |
| 554 | Reinforcing Steel | 4/1/2025 |
| 555 | Steel Structures | 11/1/2024 |
| 560 | Removal of Concrete by Hydrodemolition | 4/1/2025 |
| 563 | Coating | 7/1/2024 |
| 564 | Bearing Devices | 4/1/2024 |
| 565 | Drilled Shafts | 4/1/2024 |
| 572 | Concrete Repair | 4/1/2025 |
| 575 | Temporary Bridges | 4/1/2024 |
| 576 | Pile Encapsulation (Template) | 4/1/2024 |
| 577 | Fiber-Reinforced Polymer Structures (Template) | 4/1/2024 |
| 579 | Minor Bridge Work (Template) | 4/1/2025 |
| 580 | Alternate Bridge (Template) | 4/1/2024 |
| 581 | Structural Cable Systems (Template) | 4/1/2024 |
| 583 | Carbon Fiber Reinforced Polymer (Template) | 4/1/2024 |
| 584 | Glass Fiber Reinforced Polymer (Template) | 4/1/2024 |
| 587 | Post-Tensioning System (Template) | 4/1/2024 |
Division 600 – INCIDENTAL CONSTRUCTION |
||
| Section | Description | Revised |
| 602 | Culverts and Drains | 4/1/2024 |
| 617 | Guardrail | 4/1/2024 |
| 618 | Concrete Barriers | 4/1/2024 |
| 622 | Rental Equipment | 4/1/2024 |
| 623 | General Labor | 4/1/2024 |
| 625 | Turf Establishment | 4/2/2024 |
| 628 | Temporary Stream Diversions | 7/1/2024 |
| 633 | Permanent Traffic Control | 4/1/2024 |
| 635 | Temporary Traffic Control | 4/1/2025 |
| 636 | Traffic Signal, Traffic Counter, Lighting, and Electrical Systems | 4/1/2024 |
| 646 | Roadside Development (Template) | 4/1/2024 |
| 647 | Environmental Design (Template) | 4/1/2024 |
| 648 | Pipeline Energy Utilities (Template) | 4/1/2024 |
| 652 | Railroad Work (Template) | 4/1/2024 |
Division 700 – MATERIAL |
||
| Section | Description | Revised |
| 703 | Aggregate | 4/1/2025 |
| 705 | Rock | 4/1/2024 |
| 708 | Plastic Pipe | 4/1/2024 |
| 712 | Joint Material | 4/1/2025 |
| 713 | Roadside Improvement Material | 4/1/2024 |
| 714 | Geosynthetic Material | 4/1/2025 |
| 716 | Material for Timber Structures | 4/1/2024 |
| 717 | Structural Metal | 4/1/2024 |
| 718 | Traffic Signing and Marking Material | 4/1/2024 |
| 722 | Anchor Material | 4/1/2024 |
| 725 | Miscellaneous Material | 11/1/2024 |
Misc - 100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700