FP-24 EFL Library of Supplemental Specifications
These supplemental specifications are approved for use in the development of Special Contract Requirements (SCRs) for EFLHD projects using the FP-24. The FLH supplemental specifications are included within the FP-24 LOS when they are approved by the FLH Specifications Coordination Group (SCG).
To view/download specific supplemental specifications in Microsoft Word format, select the appropriate link below.
All FP-24 LOS documents are in US Customary unit format. The entire set of FP-24 supplemental specifications may be downloaded as a single Word document file.
100 - 150 - 250 - 300 - 400 - 600 - 700
Miscellaneous Files | ||
Section | Description | Revised |
---|---|---|
– | Single Word Document | 11/8/2024 |
Division 100 – GENERAL REQUIREMENTS | ||
Section | Description | Revised |
104 | Control of Work | 5/24/2024 |
106 | Acceptance of Work | 5/24/2024 |
108 | Prosecution and Progress | 5/24/2024 |
109 | Measurement and Payment | 9/16/2024 |
Division 150 – PROJECT REQUIREMENTS | ||
Section | Description | Revised |
152 | Construction Survey and Staking | 6/17/2024 |
154 | Contractor Sampling and Testing | 6/17/2024 |
155 | Schedules for Construction Contracts | 10/23/2024 |
156 | Public Traffic | 10/11/2024 |
157 | Soil Erosion and Sediment Control | 9/23/2024 |
Division 250 – EARTH RETAINING SYSTEMS AND SLOPES | ||
Section | Description | Revised |
255 | Mechanically-Stabilized Earth Walls | 10/23/2024 |
Division 300 – AGGREGATE AND BASE COURSES | ||
Section | Description | Revised |
301 | Untreated Aggregate Courses | 8/30/2024 |
Division 400 – ASPHALT PAVEMENTS AND SURFACE TREATMENTS | ||
Section | Description | Revised |
401 | Asphalt Concrete Pavement by Gyratory Mix Design Method | 9/23/2024 |
402 | Asphalt Concrete Pavement by Hveem or Marshall Mix Design Method | 10/23/2024 |
412 | Asphalt Tack Coat | 10/11/2024 |
414 | Asphalt Pavement Crack and Joint Sealing and Filling | 7/3/2024 |
Division 600 – INCIDENTAL CONSTRUCTION | ||
Section | Description | Revised |
628 | Temporary Stream Diversions | 10/23/2024 |
632 | Locating Utilities | 9/24/2024 |
634 | Permanent Pavement Markings | 6/18/2024 |
635 | Temporary Traffic Control | 9/9/2024 |
637/1 | Facilities and Services – Contractor Provided | 9/25/2024 |
637/2 | Facilities and Services – Government Furnished | 9/25/2024 |
637/3 | Facilities and Services – Miscellaneous Equipment | 9/25/2024 |
Division 700 – MATERIAL | ||
Section | Description | Revised |
702 | Asphalt Materials and Additives | 8/30/2024 |
703 | Aggregate | 8/30/2024 |
712 | Joint Material | 8/30/2024 |
714 | Geosynthetic Material | 11/8/2024 |
718 | Traffic Signing and Marking Material | 8/30/2024 |