WFL Standards and Details (FP-14)
Division Detail and Standard drawings are used on a continuing basis within each division to clarify the work required in the plans. WFL Drawings are arranged by FP section. Contact the Project Development Team for questions or comments on the drawings.
The drawings are available in Acrobat (PDF) and MicroStation (DGN) formats. Individual PDF pages are available for both US Customary and Metric units. The single DGN file contains sheet models for both US Customary and Metric Drawings.
Note: Use these drawings for FP-14 projects. See the FP-24 WFL Standards for drawings to be used on FP-24 projects.
Jump to Section: 157 – 253 – 617 – 619 – 626 – 633 – 646
| 101 | Terms, Format, and Definitions | Date |
|---|---|---|
W101-1 | Plan Symbols and Abbreviations (236 KB) | 6/2022 |
| 157 | Soil Erosion and Sediment Control | Date |
|---|---|---|
View Section 157 drawings (5,572 KB) | ||
W157-1 | Silt Fence (140 KB) | 10/2016 |
W157-2 | Temporary Inlet Protection (236 KB)Note: 2 Sheets | 10/2016 |
W157-15 | Check Dam, Moderate Grades (176 KB) | 10/2016 |
W157-16 | Check Dam with Rolled Erosion Control Product (140 KB) | 7/2016 |
W157-17 | Temporary Diversion Berm Methods (160 KB)Note: FP-14 only | 6/2025 |
W157-18 | Sediment Filter Bag (140 KB)Note: FP-14 only | 10/2016 |
W157-19 | Stabilized Construction Exit (128 KB)Note: FP-14 only | 7/2016 |
W157-21 | Fiber Roll (252 KB) | 7/2016 |
< Section Start | Top
| 200 | Earthwork | Date |
|---|---|---|
View Section 200 drawings (4,433 KB) | ||
W200-50 | Idaho Road Approach (144 KB) | 11/2014 |
W200-70 | Oregon Road Approach (152 KB) | 11/2014 |
W200-80 | Washington Road Approach (176 KB) | 11/2014 |
| 251 | Riprap | Date |
|---|---|---|
W251-1 | Placed Riprap at Culvert Outlets (176 KB) | 8/2016 |
| 253 | Gabions and Revet Mattresses | Date |
|---|---|---|
View Section 253 drawings (2,436 KB) | ||
W253-1 | Gabion Basket (244 KB) | 9/2011 |
W253-2 | Gabion Faced Wall (228 KB) | 9/2011 |
W253-3 | Gabion Faced Wall (164 KB) | 9/2011 |
| 601 | Minor Concrete Structures | Date |
|---|---|---|
W601-10 | Reinforced Concrete Headwall (212 KB) | 11/2024 |
| 606 | Corrugated Metal Spillways | Date |
|---|---|---|
View Section 606 drawings (3,063 KB) | ||
W606-10 | Spillway Assembly with Down Drain (176 KB) | 9/2011 |
W606-11 | Spillway Assembly with Down Drain and Slip-Joint (192 KB) | 9/2011 |
W606-12 | Spillway Assembly with Half-Round Down Drain (216 KB) | 10/2009 |
W606-13 | Corrugated Metal Spillways and Inlets (232 KB) | 10/2009 |
W606-14 | Pipe Anchor Assembly (160 KB) | 9/2009 |
| 617 | Guardrail | Date |
|---|---|---|
W617-83 | Removable Steel-backed Log Rail (360 KB)Note: 3 sheets | 3/2009 |
| 619 | Fence, Gates, Cattle Guards and Bollard Posts | Date |
|---|---|---|
View Section 619 drawings (7,146 KB) | ||
WM619-20 | Residential Chain Link Fence (226 KB) | 12/2000 |
WM619-21 | Residential Chain Link Hardware and Gate (284 KB) | 12/2000 |
WM619-22 | Chain Link Fence (280 KB) | 12/2000 |
WM619-23 | Chain Link Hardware and Gate (278 KB) | 12/2000 |
WM619-40 | Alaska Wire Fence and Gate (268 KB) | 12/2000 |
W619-50 | Idaho Fence (319 KB)Note: 3 sheets | 9/2010 |
WM619-51 | Idaho Gates (230 KB) | 12/2000 |
W619-60 | Montana Fence (213 KB)Note: 2 Sheets | 2/2010 |
W619-61 | Montana Entrance Gates (148 KB) | 3/2010 |
WM619-70 | Oregon Right-of-Way Fences (341 KB) | 12/2000 |
WM619-71 | Oregon Right-of-Way Gates (322 KB) | - |
WM619-80 | Washington Fence (366 KB) | 12/2000 |
WM619-81 | Washington Gate (148 KB) | 12/2000 |
< Section Start | Top
| 621 | Monuments and Markers | Date |
|---|---|---|
W621-1 | Right-of-Way Monumentation (152 KB) | 9/2024 |
| 626 | Plants, Trees, Shrubs, Vines, and Groundcovers | Date |
|---|---|---|
W626-1 | Trees and Shrubs Planting Methods (252 KB) | 12/2006 |
| 629 | Rolled Erosion Control Products and Cellular Confinement Systems | Date |
|---|---|---|
View Section 629 drawings (1,813 KB) | ||
W629-1 | Rolled Erosion Control Product on Slopes (288 KB)Note: FP-14 only | 10/2016 |
W629-2 | Rolled Erosion Control Product in Channels (552 KB)Note: FP-14 only | 10/2016 |
| 633 | Permanent Traffic Control | Date |
|---|---|---|
View Section 633 drawings (4,470 KB) | ||
W633-7 | Permanent Sign Installation, Wood Posts (216 KB) | 9/2024 |
W633-40 | Alaska Delineators (154 KB) | 7/2016 |
W633-50 | Idaho Delineators (172 KB) | 9/2009 |
W633-60 | Montana Delineators (172 KB) | 1/2008 |
W633-70 | Oregon Delineators (172 KB) | 12/2000 |
W633-80 | Washington Delineators (160 KB) | 1/2008 |
< Section Start | Top
| 634 | Permanent Pavement Markings | Date |
|---|---|---|
View Section 634 drawings (2,168 KB) | ||
W634-1 | Pavement Markings Symbols and Words (168 KB) | 9/2024 |
W634-2 | Linear Pavement Markings (140 KB) | 9/2024 |
| 646 | Roadside Development | Date |
|---|---|---|
View Section 646 drawings (1,911 KB) | ||
W646-1 | Mailbox Turnout and Installation (140 KB) | 11/2014 |
W646-2 | Mailbox Assembly, Series A (168 KB) | 11/2014 |
W646-3 | Mailbox Assembly, Series B (160 KB) | 11/2014 |
W646-4 | Mailbox Assembly, Series C (156 KB) | 11/2014 |
Top | Jump to Section: 157 – 253 – 617 – 619 – 626 – 633 – 646
W101-1
Plan Symbols and Abbreviations