Glenn Highway Rehabilitation, Kings River Bridge Section MP 66.0 to MP 67.2
Project Description
Grading, Base, Paving, Drainage and Structures
This project will replace the Kings River Bridge and reconstruct the Glenn Highway each side of the bridge from MP 66 to MP 67.2. The existing bridge and highway alignment will remain in place during new bridge construction to maintain traffic flow.
The new highway alignment will connect the existing highway to the new bridge and the existing abandoned highway section will be removed and graded to blend with the terrain.
Newsletters
Anticipated Timeline
- Construction: Winter 2022 - Fall 2024
- Project Completion: Fall 2024