FP-14 WFL Library of Supplemental Specifications
These supplemental specifications are approved for use in the development of Special Contract Requirements (SCR) for WFLHD projects using the FP-14. The FLH Supplement specifications are included within these supplements. Select from the appropriate links below to view/download specific supplemental specifications in MSWord format.
- Instructions for Assembling SCR Documents - information about the supplemental specification documents and how to assemble the SCR package using MS Word.
- Download all supplemental specifications (ZIP 3,125 KB)
100 - 150 - 200 - 250 - 300 - 400 - 500 - 550 - 600 - 700
Miscellaneous Files |
||
| Section | Description | Revised |
|---|---|---|
| – | Specification Revisions ![]() |
10/6/2025 |
| – | LOS definitions for NTB, 102, and 108 | 11/12/2020 |
| – | Notice to Bidders/Offerors (includes Solicitation TOC) ![]() |
10/6/2025 |
| – | SCR Review Title Page (for reviews only) | 8/1/2014 |
| – | SCR Template (w/ SCR TOC) | 2/9/2024 |
| – | Sections H, I, & J | 6/15/2022 |
Division 100 – GENERAL REQUIREMENTS |
||
| Section | Description | Revised |
| 101 | Terms, Format, and Definitions | 11/8/2021 |
| 102 | Bid, Award, and Execution of Contract ![]() |
10/6/2025 |
| 103 | Scope of Work | 4/3/2020 |
| 104 | Control of Work ![]() |
10/6/2025 |
| 105 | Control of Material | 4/2/2021 |
| 106 | Acceptance of Work ![]() |
10/6/2025 |
| 107 | Legal Relations and Responsibility to the Public ![]() |
10/6/2025 |
| 107A | Indian Preference | 4/2/2021 |
| 108 | Prosecution and Progress ![]() |
10/6/2025 |
| 109 | Measurement and Payment ![]() |
10/6/2025 |
Division 150 – PROJECT REQUIREMENTS |
||
| Section | Description | Revised |
| 151 | Mobilization | 9/17/2018 |
| 152 | Construction Survey and Staking ![]() |
10/6/2025 |
| 153 | Contractor Quality Control | 4/2/2021 |
| 154 | Contractor Sampling and Testing | 6/15/2022 |
| 155 | Schedules for Construction Contracts ![]() |
10/6/2025 |
| 156 | Public Traffic | 1/6/2023 |
| 157 | Soil Erosion and Sediment Control | 1/6/2023 |
Division 200 – EARTHWORK |
||
| Section | Description | Revised |
| 201 | Clearing and Grubbing | 1/1/2014 |
| 204 | Excavation and Embankment | 11/12/2020 |
| 208 | Structure Excavaton and Backfill for Selected Major Structures | 4/3/2020 |
Division 250 – SLOPE REINFORCEMENT AND RETAINING WALLS |
||
| Section | Description | Revised |
| 251 | Riprap | 11/5/2015 |
| 252 | Rockery, Special Rock Embankment, and Rock Buttress | 11/12/2020 |
| 253 | Gabions and Revet Mattresses | 9/17/2018 |
| 255 | Mechanically-Stabilized Earth Walls | 9/17/2018 |
| 257 | Contractor-Designed Retaining Walls | 9/17/2018 |
| 270 | Compaction Grouting (Template) | 8/1/2014 |
| 271 | Geotechnical Exploration (Template) | 8/1/2014 |
| 273 | Polyurethane Resin Injection (Template) | 8/1/2014 |
| 274 | Vibro Columns (Template) | 8/1/2014 |
| 275 | Geofoam (Template) | 8/1/2014 |
Division 300 – AGGREGATE AND BASE COURSES |
||
| Section | Description | Revised |
| 301 | Untreated Aggregate Courses | 4/2/2021 |
| 302 | Minor Crushed Aggregate | 4/2/2021 |
| 307 | Cement Treated Aggregate Course (Template) | 8/1/2014 |
| 308 | Recycled Aggregate Base | 4/2/2021 |
| 309 | Emulsified Asphalt-Treated Base Course | 11/8/2021 |
| 310 | Cold In-Place Recycled Asphalt Base Course | 3/31/2016 |
| 311 | Stabilized Aggregate Surface Course | 11/1/2024 |
| 313 | Aggregate-Topsoil Course | 8/1/2014 |
Division 400 – ASPHALT PAVEMENTS AND SURFACE TREATMENTS |
||
| Section | Description | Revised |
| 401 | Asphalt Concrete Pavement by Gyratory Mix Design Method | 7/1/2024 |
| 402 | Asphalt Concrete Pavement by HVEEM or Marshall Mix Design Method | 7/20/2015 |
| 403 | Asphalt Concrete | 11/5/2015 |
| 407 | Chip Seal | 8/1/2014 |
| 408 | Cold Recycled Asphalt Base Course | 4/2/2021 |
| 409 | Micro Surfacing | 8/1/2014 |
| 410 | Slurry Seal | 8/1/2014 |
| 429 | Bonded Wearing Course (Template) | 8/1/2014 |
Division 500 – RIGID PAVEMENTS |
||
| Section | Description | Revised |
| 501 | Minor Concrete Pavement | 4/2/2021 |
| 502 | Concrete Pavement Restoration | 3/31/2016 |
Division 550 – BRIDGE CONSTRUCTION |
||
| Section | Description | Revised |
| 552 | Structural Concrete | 11/8/2021 |
| 553 | Prestressed Concrete | 7/21/2017 |
| 554 | Reinforcing Steel | 8/1/2014 |
| 555 | Steel Structures | 11/1/2024 |
| 562 | Temporary Works | 8/1/2019 |
| 563 | Painting | 1/6/2023 |
| 564 | Bearings | 11/5/2015 |
| 565 | Drilled Shafts | 4/2/2021 |
| 568 | High Performance Concrete | 7/20/2015 |
| 569 | Concrete Overlays for Bridge Decks | 7/20/2015 |
| 574 | Geosynthetic Reinforced Soil Integrated Bridge System (Template) | 8/1/2014 |
| 575 | Minor Bridge Work (Template) | 8/1/2014 |
| 576 | Pile Encapsulation (Template) | 8/1/2014 |
| 577 | Plastic Structures (Template) | 8/1/2014 |
| 580 | Alternate Bridge (Template) | 8/1/2014 |
| 581 | Structural Cable Systems (Template) | 8/1/2014 |
| 582 | Helical Piles (Template) | 8/1/2014 |
| 583 | Carbon Fiber Reinforced Polymer (Template) | 4/3/2020 |
| 584 | Glass Fiber Reinforced Polymer (Template) | 4/3/2020 |
| 585 | Ultra High Performce Concrete (Template) | 4/3/2020 |
| 586 | Precast Segmental Concrete (Template) | 4/2/2021 |
| 587 | Post-Tensioning System (Template) | 4/2/2021 |
Division 600 – INCIDENTAL CONSTRUCTION |
||
| Section | Description | Revised |
| 602 | Culverts and Drains | 6/15/2022 |
| 603 | Structural Plate Structures | 7/20/2015 |
| 611 | Water Systems | 8/1/2014 |
| 612 | Sanitary Sewer Systems | 8/1/2014 |
| 613 | Simulated Stone Masonry Surface | 11/12/2020 |
| 617 | Guardrail | 7/1/2024 |
| 622 | Rental Equipment | 8/1/2014 |
| 623 | General Labor | 8/1/2014 |
| 625 | Turf Establishment | 8/1/2014 |
| 633 | Permanent Traffic Control | 8/1/2014 |
| 634 | Permanent Pavement Markings | 4/2/2021 |
| 635 | Temporary Traffic Control | 7/1/2024 |
| 636 | Traffic Signal, Traffic Counter, Lighting, and Electrical Systems | 8/1/2014 |
| 637 | Facilities and Services | 8/1/2014 |
| 645 | Locating Utilities (Template) | 8/1/2014 |
| 646 | Roadside Development (Template) | 8/1/2014 |
| 647 | Environmental Mitigation (Template) | 8/1/2014 |
| 648 | Pipeline Energy Utilities (Template) | 8/1/2014 |
| 650 | Temporary Diversions Template) | 8/1/2014 |
| 651 | Rockfall Protection (Template) | 8/1/2014 |
| 652 | Railroad Work (Template) | 8/1/2014 |
| 653 | Midslope Rockfall Attenuator (Template) | 4/3/2020 |
| 654 | Draped Rockfall Protection (Template) | 4/3/2020 |
| 655 | Anchored Wire Mesh System (Template) | 4/3/2020 |
| 656 | Temporary Rockfall Projection (Template) | 4/3/2020 |
Division 700 – MATERIAL |
||
| Section | Description | Revised |
| 702 | Asphalt Material | 7/15/2016 |
| 703 | Aggregate | 7/1/2024 |
| 704 | Soil | 4/2/2021 |
| 705 | Rock | 8/1/2019 |
| 708 | Plastic Pipe | 8/1/2014 |
| 709 | Reinforcing Steel and Wire Rope | 11/8/2021 |
| 710 | Fence and Guardrail | 7/19/2019 |
| 712 | Joint Material | 11/5/2015 |
| 713 | Roadside Improvement Material | 11/8/2021 |
| 716 | Material for Timber Structures | 8/1/2014 |
| 717 | Structural Metal | 7/21/2017 |
| 719 | Paint | 6/15/2022 |
| 722 | Anchor Material | 1/6/2023 |
| 725 | Miscellaneous Material | 11/1/2024 |