CFL Engineer's Estimate Manual (for use with the FP-14)

The objective of this Manual is to provide a guide to the Central Federal Lands standard procedure for preparation, review, and updating of the engineer’s estimate. Major sections include:

  1. General
  2. Pay Item Selection
  3. Rounding Quantities
  4. Methods of Estimating
  5. Cost Estimating
  6. Other Resources