Appendix B. Detailed Tables of Project Costs Summaries

Table 5: Number and Cost of 2016 Projects by Improvement Category

Improvement Category Number of Projects Total Cost of Projects* Average Total Cost* Total HSIP Cost of Projects* Average HSIP Cost*
Access management 74 $24,735,205.53 $618,380.14 $19,149,121.56 $478,728.04
Advanced technology and ITS 23 $133,498,042.07 $7,026,212.74 $18,717,355.65 $985,123.98
Alignment 57 $109,742,958.24 $2,494,158.14 $83,516,678.05 $1,942,248.33
Animal-related 1 $1,605,406.00 $1,605,406.00 $1,605,406.00 $1,605,406.00
Interchange design 43 $45,468,192.30 $1,228,870.06 $35,188,717.47 $951,046.42
Intersection geometry 458 $407,951,361.13 $1,065,147.16 $264,228,117.69 $697,171.81
Intersection traffic control 608 $370,872,781.67 $690,638.33 $280,015,667.29 $529,330.18
Lighting 64 $50,795,526.81 $875,784.95 $45,617,428.72 $800,305.77
Miscellaneous 61 $61,648,392.67 $1,185,546.01 $38,550,526.49 $755,892.68
Multiple 15 $19,712,910.48 $1,314,194.03 $19,440,563.48 $1,296,037.57
Non-infrastructure 205 $83,818,845.37 $463,087.54 $72,048,428.46 $400,269.05
Parking 1 $244,896.00 $244,896.00 $244,896.00 $244,896.00
Pedestrians and bicyclists 180 $101,308,610.06 $865,885.56 $81,405,462.91 $707,873.59
Railroad grade crossings 50 $17,231,494.00 $574,383.13 $12,297,082.00 $409,902.73
Roadside 444 $459,773,354.90 $1,191,122.68 $393,629,816.45 $1,033,149.12
Roadway 1244 $1,106,988,026.56 $927,125.65 $497,480,541.80 $417,699.87
Roadway delineation 246 $261,570,735.14 $1,157,392.63 $103,763,309.83 $459,129.69
Roadway signs and traffic control 261 $70,422,979.73 $294,656.82 $66,095,010.82 $281,255.37
Shoulder treatments 220 $538,903,795.63 $2,554,046.42 $334,430,445.80 $1,584,978.42
Speed management 6 $5,639,289.00 $1,409,822.25 $443,000.00 $221,500.00
Work Zone 13 $6,669,955.78 $513,073.52 $6,584,195.78 $506,476.60
Unknown 194 $149,059,277.47 $768,346.79 $86,080,703.88 $623,773.22
Total 4468 $4,027,662,036.54 $1,011,467.11 $2,460,532,476.13 $631,877.88

* Not all states provided cost data for all projects in a given improvement category.

 

Table 6: Number and Cost of Projects by Subcategory for Intersection Geometry

Subcategory Number of Projects Total Cost
Auxiliary lanes – add left-turn lane 141 $123,639,661.11
Auxiliary lanes – add right-turn lane 32 $25,433,446.39
Auxiliary lanes – other 49 $62,997,174.60
Intersection geometrics – modify skew angle 18 $20,869,394.10
Intersection geometrics – other/unknown 204 $161,588,327.42
Intersection geometrics – realignment to improve offset 14 $13,423,357.51
Total 458 $407,951,361.13

Table 7: Number and Cost of Projects by Subcategory for Intersection Traffic Control

Subcategory Number of Projects Total Cost
Intersection flashers and signing 84 $26,426,718.00
Intersection traffic control – other/unknown 190 $97,361,597.86
Modify control to roundabout 90 $87,550,632.90
Modify traffic signal 198 $139,339,091.16
Modify traffic signal timing or phasing 37 $15,946,733.00
Pavement markings 9 $4,248,008.75
Total 608 $370,872,781.67

Table 8: Number and Cost of Projects by Subcategory for Pedestrians and Bicyclists

Subcategory Number of Projects  Total Cost 
Install or modify crosswalk 26 $3,192,251.00
Install or modify pedestrian signal 53 $32,579,159.94
Install sidewalk 30 $4,856,324.00
Miscellaneous pedestrian and bicyclist improvements 71 $60,680,875.12
Total 180 $101,308,610.06

Table 9: Number and Cost of Projects by Subcategory for Roadway

Subcategory Number of Projects Total Cost
Pavement surface 100 $105,145,037.40
Roadway – other/unknown 704 $351,258,463.55
Roadway narrowing (road diet, roadway reconfiguration) 23 $78,680,798.50
Roadway widening 59 $423,937,644.13
Rumble strips 335 $140,327,388.34
Superelevation / cross slope 23 $7,638,694.64
Total 1244 $1,106,988,026.56

Table 10: Number and Cost of Projects by Subcategory for Roadside

Subcategory Number of Projects  Total Cost 
Barrier 282 $353,246,216.17
Barrier end treatments 59 $23,384,061.92
Curb and drainage improvements 1 $1,983,967.00
Removal of roadside objects 11 $2,785,050.00
Roadside grading 18 $2,969,227.00
Roadside – other/unknown 73 $75,404,832.81
Total 444 $459,773,354.90