Granite Hill Road Reconstruction Phase II

Project Description:

Replacement of 5 existing metal culverts with 3 concrete box culverts and 2 bridges.  It includes the construction of temporary traffic bypasses with temporary bridges at the two bridge sites.

Anticipated Timeline

Advertise:  Winter 2023/2024
Construction: Spring through Fall 2024