Granite Hill Road Reconstruction Phase II
Project Description:
Replacement of 5 existing metal culverts with 3 concrete box culverts and 2 bridges. It includes the construction of temporary traffic bypasses with temporary bridges at the two bridge sites.
Anticipated Timeline
Advertise: Fall 2024
Construction: Spring through Fall 2025