Plan Packaging

A standardized approach to the organization of a project plan set provides consistency that enables easier and better plan reviews and allows for locating specific drawings quickly.  The guidelines for plan packaging should be used whenever possible.  Flexibility in the use of these guidelines is allowed for individual and specific project needs.

Plan Organization

A Sheets

Title Sheet, Typical Sections

B Sheets

Summaries and Tabs

C Sheets

Mainline Plan and Profile Sheets

D Sheets

Minor Road, Parking, Pullout Plan and Profile Sheets

E Sheets

Division 150 Layouts, Standards/Details and Specials (1)

F Sheets

Division 200 Layouts, Standards/Details and Specials (1)

G Sheets

Division 250 Layouts, Standards/Details and Specials(1)

H Sheets

Division 300 Layouts, Standards/Details and Specials (1)

K Sheets

Division 400 Layouts, Standards/Details and Specials (1)

R Sheets

Division 500 Structural Sheets

S Sheets

Division 550 - Structural Sheets

T Sheets

Division 600 Layouts, Standards/Details and Specials (1)

X Sheets

Mainline Cross Sections

Y Sheets

Parking Area, Minor Road Cross Sections

Z Sheets

Culvert Cross Sections

Plan Set Organization Notes

(1)   For the order of sheets, layout sheets should be placed 1st, standards/details 2nd, and specials last.

(2)   Do not use I, J, and O letter designations to avoid confusion between these letters and the numbers 0 and 1.

(3)   The letter designations may be adjusted to fit project-specific requirements.  For example, a complicated project may have a lot of T sheets, so the designer may break the T sheets into the following:

a.     T Sheets Division 600 sheets (through Section 629)

b.     U Sheets Utility layouts and related drawings

c.     V Sheets Section 633 and 634 layouts, standards, details, and specials

d.     W Sheets Section 635 layouts, standards, details, and specials

 

Example Index to Sheets

INDEX TO SHEETS

SHEET

DESCRIPTION

A1

Title Sheet

A2-A3

Conventional Plan and Symbols and Abbreviations

A4

Control Point Listings

A5-A6

Typical Sections

A7

Typical Sections Approach Road

B1-B5

Summary of Quantities

B6

Grading Summary and Mass Haul Diagram

B7

Drainage Summary

B8-B10

Miscellaneous Summaries

C1-C20

Mainline Plan and Profile Sheets

D1

Sacramento Lake Parking Area Plan and Profile

D2

Sunspot Road Intersection Plan

D3-D4

Thousand Mile Canyon Parking/Pullout Plan and Profile

E1-E11

Erosion Control Plan Sheets

E12-E13

157-1 Silt Fence

F1

C204-50 Embankment Benching

F2

207-A Subexcavation and Shoulder Stabilization

G1

C251-50 Placed Riprap

G2-G3

251-A Stream Bank Protection

G4-G9

MSE Wall Layout Sheets

G10

255-A MSE Wall Modular Block Face

G11

255-B MSE Wall Welded Wire Face

K1

401-A Asphalt Curb and Paved Ditch

S1-S9

Bridge Plans for Clear Creek

S10-S15

Bridge Plans for Rio De Las Vacas

T1-T2

601-1, 2 Concrete Headwall

T3-T7

602-1, 2, 3, 4, 6 Pipe Culvert

T8-T10

617-10, 17, 23 Guardrail

T11-T12

619-1, 2, 3 Cattle Guard

T13-T22

633 Mainline Signing and Striping layout

T23

633-A Sacramento Lake Parking Striping Plan

T24

633-B Thousand Mile Canyon Parking Striping

T25

635-1, 2, 3, 5, 6, 8, 14 Temporary Traffic Control

T26-T28

635-A Temporary Traffic Control Site Plan

T29

635-B Detour 28+020 to 28+084

X1-X60

Mainline Cross Sections

Y1-Y5

Sacramento Lake Parking Area Cross Sections

Y6-Y10

Thousand Mile Canyon Parking Cross Sections

Z1-Z20

Culvert Cross Sections