Archived Hardware Eligibility Letters – NCHRP 350
These letters are archived and are posted for "historical and research purposes only" per the sunset dates in the AASHTO/FHWA Joint Implementation Agreement and exceptions to these dates as posted on the AASHTO Committee on Design website.
Letter | Date Sort ascending | Testing | Manufacturer | Hardware Type | Device Description |
---|---|---|---|---|---|
SS-68 | NCHRP 350 | X-Cessories Squared | Sign Supports, Mailboxes, and Delineator Posts | Slip Base (8-inch) for Square Steel Tube posts ** | |
SS-67 | NCHRP 350 | Franklin Industries | Sign Supports, Mailboxes, and Delineator Posts | 60 KSI U-Channel Posts recertification | |
SS-65 | NCHRP 350 | Southwestern Pipe | Sign Supports, Mailboxes, and Delineator Posts | Poz-Loc Slip Base** | |
B-38 | NCHRP 350 | Connecticut DOT | Longitudinal Barriers and Bridge Rails | Merritt Parkway Guiderail (Aesthetic) TL-3 | |
CC-36 | NCHRP 350 | J. Carney | Barrier Terminals and Crash Cushions | Vanderbilt TMA @ TL-2 | |
SS-66 | NCHRP 350 | HwyCom | Sign Supports, Mailboxes, and Delineator Posts | Universal Anchor System for FRP & Poz Loc Posts | |
SS-64 | NCHRP 350 | Marion Steel | Sign Supports, Mailboxes, and Delineator Posts | Metric "Rib-Bak 2" Posts | |
SS-56B | NCHRP 350 | Marion Steel Company | Sign Supports, Mailboxes, and Delineator Posts | Redesigned Rib-Bak | |
SS-57A | NCHRP 350 | Marion Steel Company | Sign Supports, Mailboxes, and Delineator Posts | Redesigned Rib-Bak | |
SS-05A | Marion Steel Company | Sign Supports, Mailboxes, and Delineator Posts | Redesigned Rib-Bak |