Project Description:Spot repair work on FR22 between MP 0.0 and 8.0 including excavation, subexcavation, aggregate base, asphalt concrete. Anticipated Timeline Advertise: Spring 2024Construction: Summer 2024 Project Photos Existing pothole in need of full section repair Road narrowing due to edge cracking and erosion in need of repair