Cascade Dam Crest Roadway Improvements
Project Description:
The project includes the placement of an asphalt concrete surface on top of the existing gravel surface Dam Road. It also includes addressing a safety issue at the south approach to the single lane spillway bridge and improving signing as needed.
Anticipated Timeline
Advertise: Spring 2022
Construction: Spring 2022 - Summer 2022
Project Completion: Summer 2022