You are here

Waterside Drive NW Pavement Reconstruction and Streetlight Replacements

Project Description

The existing Waterside Drive pavement is severely deteriorated. The work will include full depth asphalt concrete pavement reconstruction, concrete curb and gutter, steel backed timber guardrail and lighting replacements, and other miscellaneous work. The project can be accessed by Rock Creek and Potomac Parkway NW from southeast and from Massachusetts Avenue NW from northwest. The construction inconveniences to motorists and the local homeowners will be minimized.

Anticipated Timeline

Advertisement and Award Letter: 2024
Construction: 2024

Project Photos