You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort descending Bid Tabulation Documents
WA NPS NOCA 101(4) Cascade River Road MP 21.8 Boston Creek 2015 WFL Washington PDF icon wa-nps-noca-101(4).pdf
WA NPS OLYM 2015(4) Spruce Railroad Trail Segment C 2016 WFL Washington PDF icon wa-nps-olym-2015(4).pdf
WA PRA OLYM 12(1) Hurricane Ridge Road - Bid Schedule A 2008 WFL Washington PDF icon wa-pra-olym-12(1)-a.pdf
WA FS ERFO 2015(1)-20(1) Wells Creek Repairs 2018 WFL Washington PDF icon wa-fs-erfo-2015(1)-20(1).pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Base 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6)-base.pdf
WA PRA MORA 14(7) Nisqually to Paradise Road, Phase II 2016 WFL Washington PDF icon wa-pra-mora-14(7).pdf
WA PRA-MORA 14(2)|WA PRA-MORA 14(3) Rehab Nisqually Glacier Bridge and Christine Falls Slump 2003 WFL Washington PDF icon wa-pra-mora-14(2)-14(3).pdf
WA PRA OLYM 103(3) Sol Duc Valley Road, Phase 2 2011 WFL Washington PDF icon wa-pra-olym-103(3).pdf
WA PFH 208(1) Camp Grisdale Road 2008 WFL Washington PDF icon wa-pfh-208(1).pdf
WA PRA MORA 10(11) SR 123-2 and SR 410-1c 2008 WFL Washington PDF icon wa-pra-mora-10(11).pdf
WA PRA OLYM 12(1) Hurricane Ridge Road - Bid Schedule B 2008 WFL Washington PDF icon wa-pra-olym-12(1)-b.pdf
WA RRP RIDG 100(2) River S Bridge Replacement 2019 WFL Washington PDF icon wa-rrp-ridg-100(2).pdf
WA NPS NOCA 101(3) Cascade River Road MP 21.8 Boston Creek 2014 WFL Washington PDF icon wa-nps-noca-101(3).pdf
WA PFH 164-1(1) Peola-Iron Springs Road 2000 WFL Washington PDF icon wa-pfh-164-1(1).pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Option 1 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6)-1.pdf
WA NPS MORA 14(8) Nisqually to Paradise, Phase II Utilities 2015 WFL Washington PDF icon wa-nps-mora-14(8).pdf
WA RRP-TURN 2000(2) Turnbull NWR - Auto Tour 2003 WFL Washington PDF icon wa-rrp-turn-2000(2).pdf
WA FS ERFO 2000(1)-21(2) FDR 2160 / 2204 2003 WFL Washington PDF icon wa-fs-erfo-2000(1)-21(2).pdf
WA NPS MORA 12(1) Repair Mather Memorial Slide Area 2018 WFL Washington PDF icon wa-nps-mora-12(1).pdf
WA PFH 86-1(2) Curly Creek Road 1999 WFL Washington PDF icon wa-pfh-86-1(2).pdf
WA PRA OLYM 12(1) Hurricane Ridge Road - Bid Schedule C 2008 WFL Washington PDF icon wa-pra-olym-12(1)-c.pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Summary 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6).pdf
NP NERI BMS(1) New River Gorge National River 2017 EFL West Virginia PDF icon np-neri-bms(1).pdf
HAFE 14(4) Harpers Ferry Nhp 2001 EFL West Virginia PDF icon hafe_bidtabs.pdf
ERFO NERI 121(1) New River Gorge National River 2012 EFL West Virginia PDF icon erfo-neri-121(1).pdf

Pages