You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Divisionsort descending State Bid Tabulation Documents
OR PFH 16(7) Tiller Trail Highway 2014 WFL Oregon PDF icon or-pfh-16(7).pdf
ID PFH 22-1(10) Cascade-Warm Lake Road 2007 WFL Idaho PDF icon id-pfh-22-1(10)-b.pdf
WA FS ERFO 97(2)-21(1) FDR 29 / 2923 2002 WFL Washington PDF icon wa-fs-erfo-97(2)-21(1).pdf
OR BLM MED 2015(1) Quartz Creek Culvert Replacement, Quartz Creek Culverts 2016 WFL Oregon PDF icon or-blm-med-2015(1).pdf
MT OMAD 18(45) Minuteman Missile Base Roads - Schedule D 2009 WFL Montana PDF icon mt-omad-18(45)-d.pdf
AK PRA DENA 10(34) Eagle's Nest Corner at MP 67.5 2013 WFL Alaska PDF icon ak-pra-dena-10(34).pdf
ID FS ERFO 2017(2)-81(1) & ID FS ERFO 2018(1)-81(1) Nez Perce-Clearwater Repairs 2017 and Nez Perce-Clearwater 2018 Repairs, Phase 1 2020 WFL Idaho PDF icon id-fs-erfo-2017-2-81-1a.pdf
OR FS ERFO 99(1)-13(7) Siuslaw NF Roads 2002 WFL Oregon PDF icon or-fs-erfo-99(1)-13(7).pdf
OR PFH 22(14) McKenzie Highway 2008 WFL Oregon PDF icon or-pfh-22(14).pdf
MT PFH 66-1(5) West Fork Bitterroot River Road 1999 WFL Montana PDF icon mt-pfh-66-1(5).pdf
AK PFH 44-1(1) Coffman Cove Road, Schedule B 2003 WFL Alaska PDF icon ak-pfh-44-1(1)-b.pdf
AK NPS DENA 10(41) Repave Denali Park Road MP 3.4 to 14.9 2016 WFL Alaska PDF icon ak-nps-dena-10(41)-a.pdf, PDF icon ak-nps-dena-10(41)-b.pdf, PDF icon ak-nps-dena-10(41)-c.pdf
WA PRA-MORA 13(3) Rehab Backbone Ridge Viaduct 2003 WFL Washington PDF icon wa-pra-mora-13(3).pdf
OR DOUGLAS 1(1) Tiller Trail Highway MP 40.20 - 40.41 2016 WFL Oregon PDF icon or-douglas-1(1).pdf
WA SAN JUAN 18(1) Cattle Point Road Relocation 2015 WFL Washington PDF icon wa-san-juan-18(1).pdf
WA FS ERFO 151-2101 FDR 2922 Repairs 2016 WFL Washington PDF icon wa-fs-erfo-151-2101.pdf
ID PFH 26-1(1) Ketchum-Challis Highway 2013 WFL Idaho PDF icon id-pfh-26-1(1).pdf
WA NPS ERFO 2008(1)-41(1) Quinault Area Roads 2009 WFL Washington PDF icon wa-nps-erfo-2008(1)-41(1).pdf
ID PFH 50(7) St Joe River Road 2011 WFL Idaho PDF icon id-pfh-50(7).pdf
MT DAR 2017(1) Minuteman Missile Base Roads 2017 2017 WFL Montana PDF icon mt-dar-2017(1).pdf
MT PFH 78(1) East Fork Bitterroot Road 2010 WFL Montana PDF icon mt-pfh-78(1).pdf
OR DOT 204(1) Weston-Elgin Highway Resurfacing 2020 WFL Oregon PDF icon or-dot-204-1.pdf
OR PFH 124-1(1) Beaver Creek Road 2009 WFL Oregon PDF icon or-pfh-124-1(1).pdf
ID PFH 94-1(1) Meadow Creek Road 2007 WFL Idaho PDF icon id-pfh-94-1(1).pdf
MT PFH 66-1(4) West Fork Bitterroot River Road Bridge 2003 WFL Montana PDF icon mt-pfh-66-1(4).pdf

Pages