You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort ascending Bid Tabulation Documents
WA RRP-TURN 2000(2) Turnbull NWR - Auto Tour 2003 WFL Washington PDF icon wa-rrp-turn-2000(2).pdf
WA FS ERFO 2016(1)-23(2) Okanogan-Wenatchee 2016 Repairs, Phase 1 2017 WFL Washington PDF icon wa-fs-erfo-2016(1)-23(2).pdf
WA FS ERFO 2018(1)-23(1) Okanogan-Wenatchee 2018 Repairs, Phase I 2021 WFL Washington PDF icon wa-fs-erfo-2018-1-23-1.pdf
WA RRP TURN 2000(1) Turnbull NWR Headquarters 2001 WFL Washington PDF icon wa-rrp-turn-2000(1).pdf
WA PRA-MORA 100(1) Minor Bridge Repairs - Schedule A 2005 WFL Washington PDF icon wa-pra-mora-100(1).pdf
WA PFH 158-1(2) Flowery Trail Road 2001 WFL Washington PDF icon wa-pfh-158-1(2).pdf
WA FS ERFO 2016(1)-23(1) Okanogan-Wenatchee 2016 Repairs, Phase 2 2018 WFL Washington PDF icon wa-fs-erfo-2016(1)-23(1).pdf
WA RIDGE MAIN (1) Main Avenue Access Improvements 2019 WFL Washington PDF icon wa-ridge-main-(1).pdf
WA FS ERFO 96-22(13) Gifford Pinchot National Forest, FDR 26 2001 WFL Washington PDF icon wa-fs-erfo-96-22(13).pdf
WA PRA-MORA 10(9) Mather Memorial Parkway (Stone Masonry) 1999 WFL Washington PDF icon wa-pra-mora-10(9).pdf
WA PFH 164-1(1) Peola-Iron Springs Road 2000 WFL Washington PDF icon wa-pfh-164-1(1).pdf
WA PFH 158-1(3) Flowery Trail Road - HUBZone Evaluation 2002 WFL Washington PDF icon wa-pfh-158-1(3)-hz.pdf
WA PFH 208(1) Camp Grisdale Road 2008 WFL Washington PDF icon wa-pfh-208(1).pdf
WA PRA OLYM 12(1) Hurricane Ridge Road - Bid Schedule A 2008 WFL Washington PDF icon wa-pra-olym-12(1)-a.pdf
WA NPS NOCA 101(3) Cascade River Road MP 21.8 Boston Creek 2014 WFL Washington PDF icon wa-nps-noca-101(3).pdf
WA FS ERFO 2017(1)-22(11) Gifford Pinchot Repairs 2017 2020 WFL Washington PDF icon wa-fs-erfo-2017-1-22-11.pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Base 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6)-base.pdf
WA NPS ERFO 2008(1)-41(1) Quinault Area Roads 2009 WFL Washington PDF icon wa-nps-erfo-2008(1)-41(1).pdf
WA PFH 158-1(5) Flowery Trail Road 2005 WFL Washington PDF icon wa-pfh-158-1(5).pdf
WA PRA OLYM 12(1) Hurricane Ridge Road - Bid Schedule B 2008 WFL Washington PDF icon wa-pra-olym-12(1)-b.pdf
WA PRA-MORA 10(10) State Route 123 Phase I - Schedule A 2004 WFL Washington PDF icon wa-pra-mora-10(10)-a.pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Option 1 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6)-1.pdf
WA PFH 203-1(1) Wynoochee Road 2003 WFL Washington PDF icon wa-pfh-203-1(1).pdf
WA PRA MORA 14(6) NISQUALLY TO PARADISE ROAD, PHASE I - Schedule A 2013 WFL Washington PDF icon wa-pra-mora-14(6)-a.pdf
WA FS ERFO 2000(1)-21(2) FDR 2160 / 2204 2003 WFL Washington PDF icon wa-fs-erfo-2000(1)-21(2).pdf

Pages