You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Divisionsort descending State Bid Tabulation Documents
AK PFH 40(2) Slo Duc Bridge 2007 WFL Alaska PDF icon ak-pfh-40(2).pdf
OR DOT 140(1) Klamath County Boat Marina to Lakeshore Drive 2021 WFL Oregon PDF icon or-140-1-t.pdf
ID PFH 60-1(3) Salmon River Road - Schedule D 2007 WFL Idaho PDF icon id-pfh-60-1(3)-d.pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Option 1 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6)-1.pdf
OR JEFF 2-37(1) Trout Creek Campground Pavement Connection 2015 WFL Oregon PDF icon or-jeff-2-37(1).pdf
ID PFH CDP 67(2) Grangemont Road - Schedule A 2010 WFL Idaho PDF icon id-pfh-cdp-67(2)-a.pdf
MT PRA-BICA 13(1) Lovell Area Roads - Schedule Y 2005 WFL Montana PDF icon mt-pra-bica-13(1)-y.pdf
WA PRA MORA 14(6) NISQUALLY TO PARADISE ROAD, PHASE I - Schedule A 2013 WFL Washington PDF icon wa-pra-mora-14(6)-a.pdf
OR PFH 163(14) Crown Point Viaduct Restoration Project 2012 WFL Oregon PDF icon or-pfh-163(14).pdf
MT PLH 83-1(3) Stillwater River Road 2001 WFL Montana PDF icon mt-plh-83-1(3).pdf
WA LEWIS 707(1) Cispus Road Improvements 2016 WFL Washington PDF icon wa-lewis-707(1).pdf
MT DAR 2020(1) Defense Access Roads FY 2020 2020 WFL Montana PDF icon mt-dar-2020-1.pdf
AK PFH 59(1) Snug Harbor Road Paving and Bike Trail 2016 WFL Alaska PDF icon ak-pfh-59(1).pdf
AK PFH 40(3) Jenny Creek Bridge 2010 WFL Alaska PDF icon ak-pfh-40(3).pdf
MT OMAD 18(36) Minuteman Missile Base Roads 2003 WFL Montana PDF icon mt-omad-18(36).pdf
MT OMAD 18(45) Minuteman Missile Base Roads - Schedule A 2009 WFL Montana PDF icon mt-omad-18(45)-a.pdf
ID PFH 60(5) Salmon River Road Connection/Extension 2010 WFL Idaho PDF icon id-pfh-60(5).pdf
OR PFH 163(19) Historic Columbia River Highway State Trail - Lindsey Creek to Starvation Creek 2016 WFL Oregon PDF icon or-or-pfh-163(19).pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Summary 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6).pdf
WA DOT 401(1) Dismal Nitch/Megler Safety Rest Area and Access Improvement 2016 WFL Washington PDF icon wa-dot-401(1).pdf
AK PRA DENA 10(32) Riprap Placement at Toklat Rest Stop - Schedule A 2009 WFL Alaska PDF icon ak-pra-dena-10(32)-a.pdf
AK DEN 2009(10) Tununak ATV Geo-Tech Trail 2012 WFL Alaska PDF icon ak-den-2009(10).pdf
ID PFH CDP 67(2) Grangemont Road - Schedule B 2010 WFL Idaho PDF icon id-pfh-cdp-67(2)-b.pdf
MT PRA-BICA 13(1) Lovell Area Roads - Schedule Z 2005 WFL Montana PDF icon mt-pra-bica-13(1)-z.pdf
WA PRA MORA 14(6) NISQUALLY TO PARADISE ROAD, PHASE I - Schedule B 2013 WFL Washington PDF icon wa-pra-mora-14(6)-b.pdf

Pages