You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Divisionsort descending State Bid Tabulation Documents
AK DEN 2009(8) Manokotak Heights Road Reconstruction - Schedule A 2013 WFL Alaska PDF icon ak-den-2009(8)-a.pdf
AK NPS SITK 2013(1) Replace Indian River Bridge 2016 WFL Alaska PDF icon ak-nps-sitk-2013(1).pdf
ID PFH 60(4) Little Salmon River Bridge - US 95 Turnbay 2008 WFL Idaho PDF icon id-pfh-60(4).pdf
ID PFH 24(9) Banks Lowman Highway Safety Improvements 2008 WFL Idaho PDF icon id-pfh-24(9).pdf
WY PRA-YELL 10(10) Grand Loop Road(Madison To Norris, Segment A), Schedule Y 1999 WFL Wyoming PDF icon wy-pra-yell-10(10)-y.pdf
WA PRA-MORA 10(10) State Route 123 Phase I - Schedule A 2004 WFL Washington PDF icon wa-pra-mora-10(10)-a.pdf
MT BOR 2015(1) Fresno Reservoir Road 2017 WFL Montana PDF icon mt-bor-2015(1).pdf
AK NPS DENA 10(49) Polychrome Area Improvements WFL Alaska
ID FS ERFO 2016(1)-27(1) Idaho Panhandle Repairs 2016 2018 WFL Idaho PDF icon id-fs-erfo-2016(1)-27(1).pdf
CA NPS PP 2016(9) Pavement Preservation Northern California 2018 WFL California PDF icon ca-nps-pp-2016(9).pdf
AK PFH 9-1(9) Big Salt Lake Road, Option 1 1999 WFL Alaska PDF icon ak-pfh-9-1(9)-1.pdf
AK NPS KEFJ 10(5) Exit Glacier Road Bridge Rehabilitation 2018 WFL Alaska PDF icon ak-nps-kefj-10(5).pdf
AK DEN 2009(8) Manokotak Heights Road Reconstruction - Schedule B 2013 WFL Alaska PDF icon ak-den-2009(8)-b.pdf
ID PFH 63-1(4) Council-Cuprum Road 2003 WFL Idaho PDF icon id-pfh-63-1(4).pdf
ID PFH 24(13) Banks Lowman Rockfall Hazard Mitigation, Phase I 2012 WFL Idaho PDF icon id-pfh-24(13).pdf
WA PRA-MORA 10(10) State Route 123 Phase I - Schedule B 2004 WFL Washington PDF icon wa-pra-mora-10(10)-b.pdf
AK DOT 2013(1) Klawock Community Streets Paving 2014 WFL Alaska PDF icon ak-dot-2013(1).pdf
OR PRA-JODA 201(1) Clarno Loop Road 1999 WFL Oregon PDF icon or-pra-joda-201(1).pdf
OR FS ERFO 101-1201 FSR 39-Emergency Repairs, Wallowa-Whitman National Forest 2010 WFL Oregon PDF icon or-fs-erfo-101-1201.pdf
OR DOT CRGNSA 100(6) Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing WFL Oregon
WA FS ERFO 2004(1)-20(2) White Chuck Bridge 2008 WFL Washington PDF icon wa-fs-erfo-2004(1)-20(2).pdf
AK PFH 9-1(9) Big Salt Lake Road, Option 2 1999 WFL Alaska PDF icon ak-pfh-9-1(9)-2.pdf
AK PRA KEFJ 10(3) Exit Glacier Road MP 7.0 to 8.0 - Schedule A 2012 WFL Alaska PDF icon ak-pra-kefj-10(3)-a.pdf
AK DEN 2009(8) Manokotak Heights Road Reconstruction - Schedule C 2013 WFL Alaska PDF icon ak-den-2009(8)-c.pdf
ID FE ERFO 2017(2)-28(1) Boise Repairs 2017 2018 WFL Idaho PDF icon id-fe-erfo-2017(2)-28(1).pdf

Pages