You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Namesort descending Fiscal Year Division State Bid Tabulation Documents
MO NP OZAR 2013-1(1) RELOCATION OF BAPTIST ACCESS PARKING ROAD, ALLEY SPRING CAMPGRO 2016 EFL Missouri PDF icon mo-np-ozar-2013-1(1).pdf
AK NPS KLGO 10(1) Repair Dyea Flats Road and Slide Cemetery Road 2016 WFL Alaska PDF icon ak-nps-klgo-10(1).pdf
WA NPS MORA 12(1) Repair Mather Memorial Slide Area 2018 WFL Washington PDF icon wa-nps-mora-12(1).pdf
AZ PRA PEFO 10(4) Repair/Overlay Park Roads and Pullouts 2009 CFL Arizona PDF icon petrified-bid-tabs-a.pdf, PDF icon petrified-bid-tabs-b.pdf, PDF icon petrified-bid-tabs-x.pdf
AK NPS DENA 10(44) Repave Denali Park Road MP 3.4 To 14.7, Phase II 2017 WFL Alaska PDF icon ak-nps-dena-10(44).pdf
AK NPS DENA 10(41) Repave Denali Park Road MP 3.4 to 14.9 2016 WFL Alaska PDF icon ak-nps-dena-10(41)-a.pdf, PDF icon ak-nps-dena-10(41)-b.pdf, PDF icon ak-nps-dena-10(41)-c.pdf
AK NPS SITK 2013(1) Replace Indian River Bridge 2016 WFL Alaska PDF icon ak-nps-sitk-2013(1).pdf
NC PFH 101-1(1) Replacement Of Bridge #99 Over Panther Creek 2008 EFL North Carolina PDF icon tabulation-of-bid-nc-pfh-101-1(1).pdf
ERFO-POC 10(2) Replacement Of Embankment Material And Aggregate Surfacing On Roads 2007 EFL North Carolina PDF icon erfo-poc-10(2).pdf
FTNP-FOPU 10(3) REPLACEMENT OF FORT PULASKI ENTRANCE BRIDGE 2016 EFL Georgia PDF icon ftnp-fopu-10(3).pdf
NP-MACA 001T(1) REPLACEMENT OF MAMMOTH CAVE VISITOR CENTER BRIDGE 2017 EFL Kentucky PDF icon np-maca-001t(1).pdf
FL PFH 12-1(1) Replacement Of River Styx Bridges 2008 EFL Florida PDF icon dtfh71-08-b-00029.pdf
PRA-DEWA 14(1) Replacement Of U.s Route 209 Bridge Over Toms Creek 2009 EFL Pennsylvania PDF icon pra-dewa_14(10).pdf
BISO 150(1) - 913(1) - 914(1) Resurfacing Of Leatherwood Ford Rd From Park Ent. To Rd Gate And Of Two 2006 EFL Tennessee PDF icon biso-150_1-bid-tabulation.pdf
CO FTNP COLM 10(3) Rim Rock Drive 2006 CFL Colorado PDF icon rimrock.pdf
AK PRA DENA 10(32) Riprap Placement at Toklat Rest Stop - Schedule A 2009 WFL Alaska PDF icon ak-pra-dena-10(32)-a.pdf
AK PRA DENA 10(32) Riprap Placement at Toklat Rest Stop - Schedule B 2009 WFL Alaska PDF icon ak-pra-dena-10(32)-b.pdf
AK PRA DENA 10(32) Riprap Placement at Toklat Rest Stop - Schedule C 2009 WFL Alaska PDF icon ak-pra-dena-10(32)-c.pdf
WA RRP RIDG 100(2) River S Bridge Replacement 2019 WFL Washington PDF icon wa-rrp-ridg-100(2).pdf
ID CANYON 2013(1) Riverside Road and Lake Shore Drive Rehabilitation 2017 WFL Idaho PDF icon id-canyon-2013(1).pdf
GREE 11(1) Road and Parking Area Pavement Rehabilitation and New Bridge Construction at Still Creek 2019 EFL Maryland
PRA-ROCR 3A6 Rock Creek & Potomac Parkway 2010 EFL District of Columbia PDF icon pra-rocr-3a6.pdf
AK PRA DENA 10(26) Rock Creek Culvert 2013 WFL Alaska PDF icon ak-pra-dena-10(26).pdf
PRA-ROCR 18(1) Rock Creek Park - 8a Competitive Solicitation 2002 EFL District of Columbia PDF icon rockcreek1.16.02.pdf
AK PRA DENA 10(10) Rock Creek Pedestrian Bridge 2001 WFL Alaska PDF icon ak-pra-dena-10(10).pdf

Pages