You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort descending Bid Tabulation Documents
OK RRP WIMO 11(1) & 10(1) Wichita Mountains NWR 2010 CFL Oklahoma PDF icon okrrpwimoscheda.pdf, PDF icon okrrpwimoschedb.pdf, PDF icon okrrpwimoschedc.pdf
OK PRA CHICK 10(2) Chickasaw National Recreation Area 2007 CFL Oklahoma
OK PRA CHIC 214(1) - 215(1) - 10(1) - 13(1) - 203(1) Veterans Lake, Perimeter and Point Roads 2002 CFL Oklahoma PDF icon chick-a.pdf, PDF icon chick-b.pdf, PDF icon chick-c.pdf
OR FS ERFO 97-10(1) Lowell/Oakridge Area Roads 2001 WFL Oregon PDF icon or-fs-erfo-97-10(1).pdf
OR RRP-MALH 2000(1) Malheur Refuge Roads - Bid Schedule A 2003 WFL Oregon PDF icon or-rrp-malh-2000(1).pdf
OR BLM 97-35(3) Jimbo Road 1999 WFL Oregon PDF icon or-blm-97-35(3).pdf
OR BAKER 520(1) Granite Hill Highway Reconstruction 2016 WFL Oregon PDF icon or-baker-520(1).pdf
OR PFH 85-1(1) Warner Highway 1999 WFL Oregon PDF icon or-pfh-85-1(1).pdf
OR FS ARRA FDR 33(4) Agness Road Reconstruction Phase 2 - Schedule B 2010 WFL Oregon PDF icon or-fs-arra-fdr-33(4)-b.pdf
OR DOT CRGNSA 100(1); OR DOT CRGNSA 100(3); OR HOODRIVER 18(1) Historic Columbia River Highway State Trail; Historic Columbia River Highway Summit Creek Viaduct; Wyeth Trailhead 2017 WFL Oregon PDF icon or-dot-crgnsa-100(1)-100(3)-hoodriver-18(1).pdf
OR BLM 2011(1) Lower Deschutes Road Resurfacing 2012 WFL Oregon PDF icon or-blm-2011(1).pdf
OR FS ARRA FDR 33(4) Agness Road Reconstruction Phase 2 - Schedule C 2010 WFL Oregon PDF icon or-fs-arra-fdr-33(4)-c.pdf
OR PRA CRLA 14(1) Rehabilitate West Rim Drive and East Rim Drive 2015 WFL Oregon PDF icon or-pra-crla-14(1).pdf
OR EMK 2005(3) NORTH BANK LANE - Schedule A 2010 WFL Oregon PDF icon or-emk-2005(3)-a.pdf
OR FS ERFO 97-19(2) FDR 3730- 3730-800 2001 WFL Oregon PDF icon or-fs-erfo-97-19(2).pdf
OR PRA CRLA 2013(1) Crater Lake National Park Rockfall Mitigation, Phase I and II 2014 WFL Oregon PDF icon or-pra-crla-2013(1).pdf
OR BLM ERFO 99(1)-30(8) Salem District Roads 2001 WFL Oregon PDF icon or-blm-erfo-99(1)-30(8).pdf
OR FS ERFO 121-1901 Agness Road Slide Repair at FSR 3348 2013 WFL Oregon PDF icon or-fs-erfo-121-1901.pdf
OR PFH 16-1(4) Canyonville-Trail Highway 2001 WFL Oregon PDF icon or-pfh-16-1(4).pdf
OR PFH 247(1) - OR PFH 247(2) Skyliners Road Improvements - Skyliners Road Trailhead Enhancements 2014 WFL Oregon PDF icon or-pfh-247(1)-or-pfh-247(2).pdf
OR PFH 22(14) McKenzie Highway 2008 WFL Oregon PDF icon or-pfh-22(14).pdf
OR EMK 2005(3) NORTH BANK LANE - Schedule B 2010 WFL Oregon PDF icon or-emk-2005(3)-b.pdf
OR PFH 155-1(2) Blaine Road 2007 WFL Oregon PDF icon or-pfh-155-1(2).pdf
OR FS ERFO 97-18(4) FDR 5325 Elk River Road - Bid Schedule A 2003 WFL Oregon PDF icon or-fs-erfo-97-18(4).pdf
OR FS ERFO 121-19102 Agness Road Slide Repair, MP13.2 2014 WFL Oregon PDF icon or-fs-erfo-121-19102.pdf

Pages