You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Divisionsort descending State Bid Tabulation Documents
GWMP 1A85 George Washington Memorial Parkway 2001 EFL Virginia PDF icon gw1a85-bidtab.pdf
NASA-1(3) National Aeronautics And Space Administration 2013 EFL Virginia PDF icon nasa-1(3).pdf
VI NH 107(3) Virgin Islands Public Works Project St. John 2003 EFL Virgin Islands PDF icon vi-nh 107(3).pdf
PRA-EVER 10(2) Everglades National Park 2012 EFL Florida PDF icon pra-ever-10(2).pdf
ERFOPLH NERI 14(3) Glade Creek Road 2007 EFL West Virginia PDF icon erfo-plh-neri-14-3.pdf
PRA-BLRI 2T13 Blue Ridge Parkway 2010 EFL North Carolina PDF icon blri-2t13.pdf
MIS10(1) Mississippi Sandhill Crane National Wildlife Refuge 2004 EFL Mississippi PDF icon mis_10-1_bt.pdf
BISO 150(1) - 913(1) - 914(1) Resurfacing Of Leatherwood Ford Rd From Park Ent. To Rd Gate And Of Two 2006 EFL Tennessee PDF icon biso-150_1-bid-tabulation.pdf
CHOH 235(1) Chesapeake And Ohio Canal Nhp 2001 EFL Maryland PDF icon bid-tabulation-choh-235.pdf
TEA-21 NATR 3014|TEA-21-NATR 3014b Natchez Trace Parkway 2004 EFL Mississippi PDF icon 3014_scheduleb.pdf, PDF icon 3014_schedulea.pdf
PRA FOOT 15A31 Foothills Parkway 2004 EFL Tennessee PDF icon pra_foot_15a31.pdf
NC PFH 100-1(1) North Carolina Forest Highway 2005 EFL North Carolina PDF icon nc_pfh_100-1(1).pdf
AK PRA-DENA 10(15) Park Road, Igloo Canyon and Hogan Creek Crossing Culvert Replacement, Schedule C 2007 WFL Alaska PDF icon ak-pra-dena-10(15)-c.pdf
MT BEAVERHEAD 273(1) Elk Lake Road 2017 WFL Montana PDF icon mt-beaverhead-273(1).pdf
MT BLM ERFO 111-7401 Maiden Canyon Repairs 2013 WFL Montana PDF icon mt-blm-erfo-111-7401.pdf
WA NPS ERFO 2004(1) - 40(2) Sol Duc Repairs - Schedule A 2005 WFL Washington PDF icon wa-nps-erfo-2004(1)-40(2).pdf
WA RRP LIPE 101(2) Blacktail Mountain Road - Schedule A 2003 WFL Washington PDF icon wa-rrp-lipe-101(2)-a.pdf
AK PRA-DENA 10(16) Denali Park Road Milepost 70-72 2004 WFL Alaska PDF icon ak-pra-dena-10(16).pdf
ID PFH 60(5) Salmon River Road Connection/Extension 2010 WFL Idaho PDF icon id-pfh-60(5).pdf
AK DEN 2009(11) Atka Roads Surfacing - Schedule B 2010 WFL Alaska PDF icon ak-den-2009(11)-b.pdf
WA FS ERFO 2016(1)-22(1) Cowlitz Valley Road Repairs 2017 WFL Washington PDF icon wa-fs-erfo-2016(1)-22(1).pdf
AK PRA DENA 10(32) Riprap Placement at Toklat Rest Stop - Schedule A 2009 WFL Alaska PDF icon ak-pra-dena-10(32)-a.pdf
OR FS ARRA FDR 33(4) Agness Road Reconstruction Phase 2 - Schedule B 2010 WFL Oregon PDF icon or-fs-arra-fdr-33(4)-b.pdf
AK DEN 2009(10) Tununak ATV Geo-Tech Trail 2012 WFL Alaska PDF icon ak-den-2009(10).pdf
OR BLM 99-35(4) Hult Pond Bridge 2001 WFL Oregon PDF icon or-blm-99-35(4).pdf

Pages