You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Namesort ascending Fiscal Year Division State Bid Tabulation Documents
FW-GRDI 105(1) Portsmouth Ditch Road - Great Dismal Swamp National Wildlife Refuge 2017 EFL Virginia PDF icon fw-grdi-105(1).pdf
AK PRA DENA 10(31) Porcupine Forest Road Repair 2012 WFL Alaska PDF icon ak-pra-dena-10(31).pdf
FS AL 337(1) Pond Creek Under Rt337 Culvert Replacement In The Conecuh National 2007 EFL Alabama PDF icon dtfh71-07-b-00044.pdf
MT FLATHEAD 543(1) Pleasant Valley Road Relocation 2016 WFL Montana PDF icon mt-flathead-543(1)-a.pdf, PDF icon mt-flathead-543(1)-b.pdf
ERFONC FS 981(1) |PRA-FIIS 100(1) |PRA-GWMP 1A82 - 1A87 |NC FSERFO 423(1) | PRA-SAHI 900(1) |MS PFH 40 1(6) Pisgah National Forest 2006 EFL North Carolina PDF icon ms-pfh-40-1(6)b-bidtab.pdf, PDF icon pra-sahi-900_1-tabulation-of-bid.pdf, PDF icon nc-fs-erfo-423_1-tabulation-of-bid.pdf, PDF icon gwmp-1a82_1a87-tabulation-of-bids.pdf, PDF icon fiis-100_1-tabulation-of-bids.pdf, PDF icon erfo-nc-fs-981_1-tabulation-of-bids.pdf
ERFO-NC-FS-5046(1) Pisgah National Forest 2007 EFL North Carolina PDF icon erfo -nc-fs-5046-1.pdf
ERFO-NC FDR 475(1) - NC PFH 100-1(3) PISGAH NATIONAL FOREST 2010 EFL North Carolina PDF icon nc-erfo-fsr-2013-2(1).pdf, PDF icon erfo -nc-fs-5046-1.pdf, PDF icon erfo-nc-fs-981_1-tabulation-of-bids.pdf, PDF icon fiis-100_1-tabulation-of-bids.pdf, PDF icon gwmp-1a82_1a87-tabulation-of-bids.pdf, PDF icon nc-fs-erfo-423_1-tabulation-of-bid.pdf, PDF icon pra-sahi-900_1-tabulation-of-bid.pdf, PDF icon ms-pfh-40-1(6)b-bidtab.pdf, PDF icon erfo-nc-fdr-475(1)-nc-pfh-100-1(3).pdf
NC NC ERFO FSR 2013-2(1) Pisgah National Forest 2016 EFL North Carolina PDF icon nc-erfo-fsr-2013-2(1).pdf
PRA-PISC 10(1) Piscataway National Park 2009 EFL Maryland PDF icon pra-pisc-10(1).pdf
MT PFH 73-1(4) Pioneer Mountains Scenic Byway 2000 WFL Montana PDF icon mt-pfh-73-1(4).pdf
MT PFH 73-1(5) Pioneer Mountains Scenic Byway 2005 WFL Montana PDF icon mt-pfh-73-1(5).pdf
CA FTNP JOTR 11(3) Pinto Basin Road 2013 CFL California PDF icon bidtabs_002.pdf
PRA-PIRO 15(1) Pictured Rocks National Lakeshore 2010 EFL Michigan PDF icon pra-piro-15(1).pdf
MT PFH 71-1(1) Petty Creek Road 2011 WFL Montana PDF icon mt-pfh-71-1(1).pdf
WA PFH 164-1(1) Peola-Iron Springs Road 2000 WFL Washington PDF icon wa-pfh-164-1(1).pdf
WHHO 407(1) Pennsylvania Avenue - Pavement Rehabilitation 2009 EFL District of Columbia PDF icon whho_407(1).pdf
RRP-PED 10(1) Pee Dee National Wildlife Refuge 2010 EFL North Carolina PDF icon rrp-ped_10(1).pdf
NM PRA PECO 10(1) Pecos-Route 10 2001 CFL New Mexico PDF icon pecos.pdf
OR BLM ERFO 151-3202 Peavine Road Repair 2015 WFL Oregon PDF icon or-blm-erfo-151-3202.pdf
ID FS ERFO 2017(2)-80(1) Payette Repairs 2017 2020 WFL Idaho PDF icon id-fs-erfo-2017-2-80-1.pdf
VI 66(9) Contract 3v Paving And Misc. For Christiansted Bypass 2009 EFL Virgin Islands PDF icon vi-66(9)_c-3.pdf
PRA-NATR 2A17 Pavement Rehabilitation, MP 331.19 TO 340.86 2015 EFL Alabama PDF icon pra-natr-2a17.pdf
PRA-NATR 3D30 - E12 Pavement Rehabilitation Mp 252266.2 2008 EFL Mississippi PDF icon pra-natr-3d30-e12.pdf
MWR PMS MN(1) PAVEMENT PRESERVATION OF ROADS AND PARKING AREAS 2016 EFL Minnesota PDF icon mwr-pms-mn(1).pdf
CA NPS PP 2016(9) Pavement Preservation Northern California 2018 WFL California PDF icon ca-nps-pp-2016(9).pdf

Pages