Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort ascending Bid Tabulation Documents
AK PRA-DENA 10(21)(22) Toklat Reststop Bank Stabilization, Denali Park Road Mile 68 Slide Repair 2005 WFL Alaska PDF icon ak-pra-dena-10(21)(22).pdf
AK EMK 2005(1) King Cove Roads, All Schedules 2007 WFL Alaska PDF icon ak-emk-2005(1).pdf
AK PFH 44-1(2) Coffman Cove Road, Phase 2, Schedule A 2006 WFL Alaska PDF icon ak-pfh-44-1(2).pdf
AK NPS DENA 10(44) Repave Denali Park Road MP 3.4 To 14.7, Phase II 2017 WFL Alaska PDF icon ak-nps-dena-10(44).pdf
AK PRA DENA 10(26) Rock Creek Culvert 2013 WFL Alaska PDF icon ak-pra-dena-10(26).pdf
AK PRA DENA 10(13) Denali Park Road, Sanctuary Area 2013 WFL Alaska PDF icon ak-pra-dena-10(13).pdf
AK DOT 135(2) Glenn Highway Chickaloon Bridge 2015 WFL Alaska PDF icon ak-dot-135(2).pdf
AK PFH 44-1(1) Coffman Cove Road, Schedule A 2003 WFL Alaska PDF icon ak-pfh-44-1(1)-a.pdf
AK NPS DENA 10(41) Repave Denali Park Road MP 3.4 to 14.9 2016 WFL Alaska PDF icon ak-nps-dena-10(41)-a.pdf, PDF icon ak-nps-dena-10(41)-b.pdf, PDF icon ak-nps-dena-10(41)-c.pdf
AK TTP CHIC 2013(1) Dene Tene Pedestrian Path 2017 WFL Alaska PDF icon ak-ttp-chic-2013(1).pdf
AK FS TNF 2(1) Auke Recreation Roadway Rehab 2017 WFL Alaska PDF icon ak-fs-tnf-2(1).pdf
AK DOT 135(5) Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77.4 to 87.2 2017 WFL Alaska PDF icon ak-dot-135(5).pdf
AK PFH 44-1(1) Coffman Cove Road, Schedule B 2003 WFL Alaska PDF icon ak-pfh-44-1(1)-b.pdf
AK NPS SITK 2013(1) Replace Indian River Bridge 2016 WFL Alaska PDF icon ak-nps-sitk-2013(1).pdf
AK PRA DENA 10(10) Rock Creek Pedestrian Bridge 2001 WFL Alaska PDF icon ak-pra-dena-10(10).pdf
AK DEN 2009(7) Manley Hot Springs Community Streets 2011 WFL Alaska PDF icon ak-den-2009(7).pdf
AK ANCHORAGE T 2016(1) Connecting Anchorage Trail Improvements WFL Alaska
AK PRA DENA 10(29) East Fork Toklat River Road Bridge Repairs 2013 WFL Alaska PDF icon ak-pra-dena-10(29).pdf
AK BLM (1) Yakataga Bridge Replacement, Schedule A 2005 WFL Alaska PDF icon ak-blm-(1).pdf
AK DEN 2011(1) Metlakatla-Walden Point Connector Road 2011 WFL Alaska PDF icon ak-den-2011(1).pdf
AK DEN 2009(8) Manokotak Heights Road Reconstruction - Schedule A 2013 WFL Alaska PDF icon ak-den-2009(8)-a.pdf
AK DOT 135(6) Glenn Highway Rehabilitation, Kings River Bridge Section MP 66.0 to MP 67.2 WFL Alaska
AK DEN 2009(14) Akhiok Tsunami Shelter Road Surfacing 2011 WFL Alaska PDF icon ak-den-2009(14).pdf
AK DEN 2009(8) Manokotak Heights Road Reconstruction - Schedule B 2013 WFL Alaska PDF icon ak-den-2009(8)-b.pdf
PRA-NATR 2B5 Natchez Trace Parkway John Coffee Memorial Bridge 2014 EFL Alabama PDF icon pra-natr-2b5.pdf