Bid Tabulations
Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.
Project Number | Project Name | Fiscal Year | Division |
State![]() |
Bid Tabulation Documents |
---|---|---|---|---|---|
AK DEN 2010(3) | Tununak Community Streets Schedule C | 2014 | WFL | Alaska |
![]() |
AK NPS KLGO 10(1) | Repair Dyea Flats Road and Slide Cemetery Road | 2016 | WFL | Alaska |
![]() |
AK PRA-DENA 10(20) | Denali Park Road (Mile 1-15 Culvert Replacement) | 2005 | WFL | Alaska |
![]() |
AK PFH 40(3) | Jenny Creek Bridge | 2010 | WFL | Alaska |
![]() |
AK FNSB TANANA(1) | Tanana River Recreation Access Improvements | WFL | Alaska | ||
AK DEN 2007(2) | Coffman Cove Dock | 2009 | WFL | Alaska |
![]() |
AK PRA DENA 10(27) | Rehab Unsafe Road Sections of the Denali Park Road - Schedule A | 2010 | WFL | Alaska |
![]() |
AK PRA-DENA 10(14) | Denali Park Road (Savage River Turnaround & Tattler Site) | 2003 | WFL | Alaska |
![]() |
AK PRA-GLBA 10(2) | Main Park Road, Phase II | 2001 | WFL | Alaska |
![]() |
AK BIA AIR 7(8) | Walden Point Road Paving | 2011 | WFL | Alaska |
![]() |
AK DEN 2009(11) | Atka Roads Surfacing - Schedule A | 2010 | WFL | Alaska |
![]() |
AK PFH 44-1(4) | Coffman Cove Road, Paving | 2007 | WFL | Alaska |
![]() |
AK PRA DENA 10(27) | Rehab Unsafe Road Sections of the Denali Park Road - Schedule B | 2010 | WFL | Alaska |
![]() |
AK PRA-DENA 10(16) | Denali Park Road Milepost 70-72 | 2004 | WFL | Alaska |
![]() |
AK DEN 2009(11) | Atka Roads Surfacing - Schedule B | 2010 | WFL | Alaska |
![]() |
AK PRA DENA 10(34) | Eagle's Nest Corner at MP 67.5 | 2013 | WFL | Alaska |
![]() |
AK EMK 2005(1) | King Cove Roads, All Schedules | 2007 | WFL | Alaska |
![]() |
AK NPS DENA 10(47) & 10(48) | Repair Two Denali Park Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9 | 2021 | WFL | Alaska |
![]() |
AK PFH 44-1(2) | Coffman Cove Road, Phase 2, Schedule A | 2006 | WFL | Alaska |
![]() |
AK PRA-DENA 10(21)(22) | Toklat Reststop Bank Stabilization, Denali Park Road Mile 68 Slide Repair | 2005 | WFL | Alaska |
![]() |
AK NPS DENA 10(44) | Repave Denali Park Road MP 3.4 To 14.7, Phase II | 2017 | WFL | Alaska |
![]() |
AK PRA DENA 10(13) | Denali Park Road, Sanctuary Area | 2013 | WFL | Alaska |
![]() |
AK DOT 135(2) | Glenn Highway Chickaloon Bridge | 2015 | WFL | Alaska |
![]() |
AK PRA DENA 10(26) | Rock Creek Culvert | 2013 | WFL | Alaska |
![]() |
AK PFH 44-1(1) | Coffman Cove Road, Schedule A | 2003 | WFL | Alaska |
![]() |