You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort ascending Bid Tabulation Documents
AK NPS KLGO 10(1) Repair Dyea Flats Road and Slide Cemetery Road 2016 WFL Alaska PDF icon ak-nps-klgo-10(1).pdf
AK BIA AIR 7(8) Walden Point Road Paving 2011 WFL Alaska PDF icon ak-bia-air-7(8).pdf
AK PRA-DENA 10(14) Denali Park Road (Savage River Turnaround & Tattler Site) 2003 WFL Alaska PDF icon ak-pra-dena-10(14).pdf
AK PRA-GLBA 10(2) Main Park Road, Phase II 2001 WFL Alaska PDF icon ak-pra-glba-10(2).pdf
AK FNSB TANANA(1) Tanana River Recreation Access Improvements WFL Alaska
AK DEN 2009(11) Atka Roads Surfacing - Schedule A 2010 WFL Alaska PDF icon ak-den-2009(11)-a.pdf
AK DEN 2007(2) Coffman Cove Dock 2009 WFL Alaska PDF icon ak-den-2007(2).pdf
AK PRA DENA 10(27) Rehab Unsafe Road Sections of the Denali Park Road - Schedule A 2010 WFL Alaska PDF icon ak-pra-dena-10(27)-a.pdf
AK PRA-DENA 10(16) Denali Park Road Milepost 70-72 2004 WFL Alaska PDF icon ak-pra-dena-10(16).pdf
AK DEN 2009(11) Atka Roads Surfacing - Schedule B 2010 WFL Alaska PDF icon ak-den-2009(11)-b.pdf
AK PRA DENA 10(34) Eagle's Nest Corner at MP 67.5 2013 WFL Alaska PDF icon ak-pra-dena-10(34).pdf
AK PFH 44-1(4) Coffman Cove Road, Paving 2007 WFL Alaska PDF icon ak-pfh-44-1(4).pdf
AK PRA DENA 10(27) Rehab Unsafe Road Sections of the Denali Park Road - Schedule B 2010 WFL Alaska PDF icon ak-pra-dena-10(27)-b.pdf
AK PRA DENA 10(26) Rock Creek Culvert 2013 WFL Alaska PDF icon ak-pra-dena-10(26).pdf
AK PRA DENA 10(13) Denali Park Road, Sanctuary Area 2013 WFL Alaska PDF icon ak-pra-dena-10(13).pdf
AK NPS DENA 10(47) & 10(48) Repair Two Denali Park Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9 2021 WFL Alaska PDF icon ak-nps-dena-10-47-t.pdf
AK DOT 135(2) Glenn Highway Chickaloon Bridge 2015 WFL Alaska PDF icon ak-dot-135(2).pdf
AK PRA-DENA 10(21)(22) Toklat Reststop Bank Stabilization, Denali Park Road Mile 68 Slide Repair 2005 WFL Alaska PDF icon ak-pra-dena-10(21)(22).pdf
AK EMK 2005(1) King Cove Roads, All Schedules 2007 WFL Alaska PDF icon ak-emk-2005(1).pdf
AK PFH 44-1(2) Coffman Cove Road, Phase 2, Schedule A 2006 WFL Alaska PDF icon ak-pfh-44-1(2).pdf
AK NPS DENA 10(44) Repave Denali Park Road MP 3.4 To 14.7, Phase II 2017 WFL Alaska PDF icon ak-nps-dena-10(44).pdf
AK TTP CHIC 2013(1) Dene Tene Pedestrian Path 2017 WFL Alaska PDF icon ak-ttp-chic-2013(1).pdf
AK FS TNF 2(1) Auke Recreation Roadway Rehab 2017 WFL Alaska PDF icon ak-fs-tnf-2(1).pdf
AK DOT 135(5) Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77.4 to 87.2 2017 WFL Alaska PDF icon ak-dot-135(5).pdf
AK PFH 44-1(1) Coffman Cove Road, Schedule A 2003 WFL Alaska PDF icon ak-pfh-44-1(1)-a.pdf