You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort descending Bid Tabulation Documents
ERFO-BUFF 2015-1(1) Buffalo National River 2018 EFL Arkansas PDF icon ar-erfo-buff-2015-1(1).pdf
MWR PMS (AR) Arkansas National Parks 2011 EFL Arkansas PDF icon mwr-pms(ar).pdf
AR PFH 159-1(2) Ouachita National Forest 2013 EFL Arkansas PDF icon ar-pfh-159-1(2).pdf
AR ERFO FDR 1021B(1) - 1809(1) to 1809(7) Ozarkst. Francis National Forest 2011 EFL Arkansas PDF icon ar-erfo-fdr-1201b(1).pdf
NP HOSP 10(4) Hot Springs National Park 2017 EFL Arkansas PDF icon np-hosp10(4).pdf
AR PFH 159-1(003) Ouachita National Forest 2014 EFL Arkansas PDF icon ar-pfh-159-1(003).pdf
AR ERFO FDR 1203(1) Ozarkst. Francis National Forest 2012 EFL Arkansas PDF icon ar-erfo-fdr-1203(1).pdf
PRA-FOSM 903(1) Hot Springs National Park And Fort Smith National Historic Site 2012 EFL Arkansas PDF icon pra-hosp-11(2)-pra-fosm-903(1).pdf
AR FLAP POLK 64(1) Reconstruction of County Road 64 2016 EFL Arkansas PDF icon ar-flap-polk-64(1).pdf
HOSP 8(1) Hot Springs Np 2000 EFL Arkansas PDF icon hosp_8(1).pdf
AR FLAP POLK 64(2) Ouachita National Forest 2017 EFL Arkansas PDF icon ar-flap-polk-64(2).pdf
NP-HOSP 10(3) Reconstruction of Retaining Wall and Hot Springs Mountain Drive 2015 EFL Arkansas PDF icon np-hosp-10(3).pdf
CA FLAP INY CR2022(1) South Lake Road 2020 CFL California PDF icon Bid Tabs.pdf
CA PFH 149-1(2) Mad River Road 2004 CFL California PDF icon madrio2.pdf
CA PRA YOSE 14(3) & 16(5) Merced River Bridge/El Portal Road 2005 CFL California PDF icon mercedtabs.pdf
CA ERFO DEVA 11(1) Bonnie Clare Road 2009 CFL California PDF icon ca_ftnp_deva_11_1_bid_tabs.pdf, PDF icon bonniea.pdf, PDF icon bonnieb.pdf
CA PFH 169-1(1) Old Red Bluff Road 2012 CFL California PDF icon capfh169_1_1_bidtabs_000.pdf
CA PFH 137-1(2) Wentworth Springs Road 2000 CFL California PDF icon went.pdf
CA ERFO 8(1) Old Ridge Route 2007 CFL California PDF icon oldridgeroute-a.pdf, PDF icon oldridgeroute-b.pdf
CA FLAP 4S12(1) Rock Creek Road 2014 CFL California PDF icon bidtabs_0.pdf
CA PFH 93-1(2) Cecilville-Callahan 2005 CFL California PDF icon cecil.pdf
CA NPS PP DEVA 2016(8) Pavement Preservation Death Valley, Phase I 2018 WFL California PDF icon ca-nps-pp-deva-2016(8).pdf
CA PRA JOTR 13(1) Keys View Road 2007 CFL California PDF icon joshua-a.pdf, PDF icon joshua-b.pdf
CA PRA/NPS PWR-PRES 1(09) Northern California Pavement Preservation 2009 CFL California PDF icon ncalppa-tabs.pdf, PDF icon ncalppx-tabs.pdf, PDF icon ncalppy-tabs.pdf, PDF icon ncalppz-tabs.pdf
CA PRA LAVO 10(2) Lassen Park Road 2007 CFL California PDF icon lassena.pdf, PDF icon lassenb.pdf, PDF icon lassenc.pdf

Pages