You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort descending Bid Tabulation Documents
WA PRA-OLYM 103(2) Sol Duc Valley Road - Schedule A 2005 WFL Washington PDF icon wa-pra-olym-103(2)-b.pdf
WA PFH 86-1(2) Curly Creek Road 1999 WFL Washington PDF icon wa-pfh-86-1(2).pdf
WA NPS OLYM 2015(4) Spruce Railroad Trail Segment C 2016 WFL Washington PDF icon wa-nps-olym-2015(4).pdf
WA PRA OLYM 12(1) Hurricane Ridge Road - Bid Schedule C 2008 WFL Washington PDF icon wa-pra-olym-12(1)-c.pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Summary 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6).pdf
WA NPS OLYM 12(1) Heart O' the Hills Entrance Station Improvements 2021 WFL Washington PDF icon wa-nps-olym-12-1.pdf
WA PRA MORA 14(6) NISQUALLY TO PARADISE ROAD, PHASE I - Schedule B 2013 WFL Washington PDF icon wa-pra-mora-14(6)-b.pdf
WA FS ERFO 2000(1)-21(2) FDR 2160 / 2204 2003 WFL Washington PDF icon wa-fs-erfo-2000(1)-21(2).pdf
WA FS ERFO 2016(1)-22(1) Cowlitz Valley Road Repairs 2017 WFL Washington PDF icon wa-fs-erfo-2016(1)-22(1).pdf
WA PRA OLYM 103(3) Sol Duc Valley Road, Phase 2 2011 WFL Washington PDF icon wa-pra-olym-103(3).pdf
WA NPS NOCA 101(4) Cascade River Road MP 21.8 Boston Creek 2015 WFL Washington PDF icon wa-nps-noca-101(4).pdf
WA PRA MORA 10(11) SR 123-2 and SR 410-1c 2008 WFL Washington PDF icon wa-pra-mora-10(11).pdf
WA PRA OLYM 12(4) Hurricane Ridge Road Tunnel Repairs 2013 WFL Washington PDF icon wa-pra-olym-12(4).pdf
WA RRP RIDG 100(2) River S Bridge Replacement 2019 WFL Washington PDF icon wa-rrp-ridg-100(2).pdf
WA FS ERFO 2015(1)-20(1) Wells Creek Repairs 2018 WFL Washington PDF icon wa-fs-erfo-2015(1)-20(1).pdf
WA NPS BP MORA 2019(1) Nisqually Glacier Bridge Preservation 2021 WFL Washington PDF icon wa-nps-bp-mora-2019-1.pdf
WA PRA MORA 14(7) Nisqually to Paradise Road, Phase II 2016 WFL Washington PDF icon wa-pra-mora-14(7).pdf
WA RRP LIPE 101(2) Blacktail Mountain Road - Schedule A 2003 WFL Washington PDF icon wa-rrp-lipe-101(2)-a.pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Option 2 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6)-2.pdf
WA PRA-MORA 14(2)|WA PRA-MORA 14(3) Rehab Nisqually Glacier Bridge and Christine Falls Slump 2003 WFL Washington PDF icon wa-pra-mora-14(2)-14(3).pdf
WA FS ERFO 97(2)-21(1) FDR 29 / 2923 2002 WFL Washington PDF icon wa-fs-erfo-97(2)-21(1).pdf
WA NPS MORA 12(1) Repair Mather Memorial Slide Area 2018 WFL Washington PDF icon wa-nps-mora-12(1).pdf
WA PRA OLYM 12(2) Hurricane Ridge Road, Phase II 2018 WFL Washington PDF icon wa-pra-olym-12(2)-a.pdf, PDF icon wa-pra-olym-12(2)-b.pdf
WA PFH 12-1(4) National Park Highway Companion Sites 2000 WFL Washington PDF icon wa-pfh-12-1(4).pdf
WA PRA OLYM 12(5) Emergency Repairs of Culverts - Hurricane Ridge Road 2012 WFL Washington PDF icon wa-pra-olym-12(5).pdf

Pages