You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort descending Bid Tabulation Documents
WA FS ERFO 2017(1)-23(3) Okanogan-Wenatchee 2017 Repairs, Phase 3 2020 WFL Washington PDF icon wa-fs-erfo-2017-1-23-3.pdf
WA RRP LIPE 12(1) Rookery Road and River Camp Bridge 2007 WFL Washington PDF icon wa-rrp-lipe-12(1).pdf
WA DOT 401(1) Dismal Nitch/Megler Safety Rest Area and Access Improvement 2016 WFL Washington PDF icon wa-dot-401(1).pdf
WA LEWIS 707(1) Cispus Road Improvements 2016 WFL Washington PDF icon wa-lewis-707(1).pdf
WA RRP SAMO 2001(1) South Wahluke Slope Roads - Schedule A 2005 WFL Washington PDF icon wa-rrp-samo-2001(1).pdf
WA PRA MORA 13(5) Stevens Canyon Road - Phase II 2012 WFL Washington PDF icon wa-pra-mora-13(5).pdf
WA FS ERFO 2016(1)-23(2) Okanogan-Wenatchee 2016 Repairs, Phase 1 2017 WFL Washington PDF icon wa-fs-erfo-2016(1)-23(2).pdf
WA PRA MORA 13(4) Stevens Canyon Road, Phase I 2011 WFL Washington PDF icon wa-pra-mora-13(4).pdf
WA FS ERFO 2016(1)-23(1) Okanogan-Wenatchee 2016 Repairs, Phase 2 2018 WFL Washington PDF icon wa-fs-erfo-2016(1)-23(1).pdf
WA PRA-MORA 100(1) Minor Bridge Repairs - Schedule A 2005 WFL Washington PDF icon wa-pra-mora-100(1).pdf
WA NPS ERFO 2004(1) - 40(2) Sol Duc Repairs - Schedule A 2005 WFL Washington PDF icon wa-nps-erfo-2004(1)-40(2).pdf
WA NPS OLYM 2013(1) Spruce Railroad Trail 2015 WFL Washington PDF icon wa-nps-olym-2013(1).pdf
WA FS ERFO 96-22(13) Gifford Pinchot National Forest, FDR 26 2001 WFL Washington PDF icon wa-fs-erfo-96-22(13).pdf
WA PRA-MORA 10(9) Mather Memorial Parkway (Stone Masonry) 1999 WFL Washington PDF icon wa-pra-mora-10(9).pdf
WA PRA MORA 14(6) NISQUALLY TO PARADISE ROAD, PHASE I - Schedule A 2013 WFL Washington PDF icon wa-pra-mora-14(6)-a.pdf
WA PRA-OLYM 103(2) Sol Duc Valley Road 2004 WFL Washington PDF icon wa-pra-olym-103(2)-a.pdf
WA FWS WILL 67(1) Reikkola Parking Lot 2016 WFL Washington PDF icon wa-fws-will-67(1).pdf
WA PFH 158-1(2) Flowery Trail Road 2001 WFL Washington PDF icon wa-pfh-158-1(2).pdf
WA NPS OLYM 2016(1) Spruce Railroad Trail Segment A 2017 WFL Washington PDF icon wa-nps-olym-2016(1).pdf
WA RIDGE MAIN (1) Main Avenue Access Improvements 2019 WFL Washington PDF icon wa-ridge-main-(1).pdf
WA FS ERFO 071-2023 Suiattle River Road MP 6.0 - MP 14.4 Combined Projects 2013 WFL Washington PDF icon wa-fs-erfo-071-2023.pdf
WA PRA-MORA 10(5)|WA PFH 12-1(6) Mather Memorial Parkway, Base 2000 WFL Washington PDF icon wa-pra-mora-10(5)-wa-pfh-12-1(6)-base.pdf
WA PRA MORA 14(6) NISQUALLY TO PARADISE ROAD, PHASE I - Schedule B 2013 WFL Washington PDF icon wa-pra-mora-14(6)-b.pdf
WA PRA-OLYM 103(2) Sol Duc Valley Road - Schedule A 2005 WFL Washington PDF icon wa-pra-olym-103(2)-b.pdf
WA PFH 158-1(3) Flowery Trail Road - HUBZone Evaluation 2002 WFL Washington PDF icon wa-pfh-158-1(3)-hz.pdf

Pages