You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort descending Bid Tabulation Documents
AK DOT 2013(1) Klawock Community Streets Paving 2014 WFL Alaska PDF icon ak-dot-2013(1).pdf
AK DEN 2009(5) Akiak Roads Rehabilitation - Schedule B 2011 WFL Alaska PDF icon ak-den-2009(5)-b.pdf
AK PFH-50-1(1) Benchland Road 2002 WFL Alaska PDF icon ak-pfh-50-1(1).pdf
AK DEN 2007(1) Kobuk Bridge Replacement 2009 WFL Alaska PDF icon ak-den-2007(1).pdf
AK PRA- DENA 10(18) Park Road, 4 Mile Slump and 4.5 Mile Aufeis Section 2008 WFL Alaska PDF icon ak-pra-dena-10(18).pdf
AK ANCHORAGE T 2016(1) Connecting Anchorage Trail Improvements WFL Alaska
AK PFH 40(2) Slo Duc Bridge 2007 WFL Alaska PDF icon ak-pfh-40(2).pdf
AK NPS KEFJ 10(4) Herman Leirer Road (Exit Glacier Road) Flood Mitigation 2016 WFL Alaska PDF icon ak-nps-kefj-10(4).pdf
AK PRA-DENA 10(15) Park Road, Igloo Canyon and Hogan Creek Crossing Culvert Replacement, Schedule A 2007 WFL Alaska PDF icon ak-pra-dena-10(15)-a.pdf
AK DOT 135(6) Glenn Highway Rehabilitation, Kings River Bridge Section MP 66.0 to MP 67.2 WFL Alaska
AK PFH 40-1(1) Kake to Seal Point Road 2011 WFL Alaska PDF icon ak-pfh-40-1(1).pdf
AK PRA DENA 10(25) Realign Dog Kennels Access Road and Bus Turnaround 2010 WFL Alaska PDF icon ak-pra-dena-10(25).pdf
AK PFH 42-1(6) Control Lake - Thorne Bay, Sandy Beach Road - Part A 2002 WFL Alaska PDF icon ak-pfh-42-1(6).pdf
AK PFH 59(1) Snug Harbor Road Paving and Bike Trail 2016 WFL Alaska PDF icon ak-pfh-59(1).pdf
AK PRA-DENA 10(15) Park Road, Igloo Canyon and Hogan Creek Crossing Culvert Replacement, Schedule B 2007 WFL Alaska PDF icon ak-pra-dena-10(15)-b.pdf
AK IRR WRAN 2012(1) Weber Street Reconstruction 2014 WFL Alaska PDF icon ak-irr-wran-2012(1).pdf
AK PRA DENA 10(31) Porcupine Forest Road Repair 2012 WFL Alaska PDF icon ak-pra-dena-10(31).pdf
AK PFH 9-1(9) Big Salt Lake Road, Option 1 1999 WFL Alaska PDF icon ak-pfh-9-1(9)-1.pdf
AK NPS KEFJ 10(5) Exit Glacier Road Bridge Rehabilitation 2018 WFL Alaska PDF icon ak-nps-kefj-10(5).pdf
AK PRA KEFJ 10(3) Exit Glacier Road MP 7.0 to 8.0 - Schedule A 2012 WFL Alaska PDF icon ak-pra-kefj-10(3)-a.pdf
AK PFH 42-1(6)|AK PFH 42-1(5)|AK 43-1(6) Control Lake - Thorne Bay, Sandy Beach, North Prince of Wales - Thorne Bay Road - Summary 2002 WFL Alaska PDF icon ak-pfh-42-1(6)-etc.pdf
AK-PRA-DENA-10(38)-AK-NPS-DENA-10(40) Upper Hogan Creek Drainage & Denali Bridge Repairs 2014 WFL Alaska PDF icon ak-pra-dena-10(38)-ak-nps-dena-10(40).pdf
AK PRA DENA 10(32) Riprap Placement at Toklat Rest Stop - Schedule A 2009 WFL Alaska PDF icon ak-pra-dena-10(32)-a.pdf
AK PRA-DENA 10(15) Park Road, Igloo Canyon and Hogan Creek Crossing Culvert Replacement, Schedule C 2007 WFL Alaska PDF icon ak-pra-dena-10(15)-c.pdf
AK IRR FORT 1002(1) Ivars Road Bridge Replacement 2016 WFL Alaska PDF icon ak-irr-fort-1002(1).pdf

Pages