You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort descending Bid Tabulation Documents
AK NPS SITK 2013(1) Replace Indian River Bridge 2016 WFL Alaska PDF icon ak-nps-sitk-2013(1).pdf
AK PFH 9-1(9) Big Salt Lake Road, Base 1999 WFL Alaska PDF icon ak-pfh-9-1(9)-base.pdf
AK NPS KEFJ 10(5) Exit Glacier Road Bridge Rehabilitation 2018 WFL Alaska PDF icon ak-nps-kefj-10(5).pdf
AK PRA DENA 10(10) Rock Creek Pedestrian Bridge 2001 WFL Alaska PDF icon ak-pra-dena-10(10).pdf
AK IRR FORT 1002(1) Ivars Road Bridge Replacement 2016 WFL Alaska PDF icon ak-irr-fort-1002(1).pdf
AK PRA KEFJ 10(3) Exit Glacier Road MP 7.0 to 8.0 - Schedule A 2012 WFL Alaska PDF icon ak-pra-kefj-10(3)-a.pdf
AK DEN 2009(4) Gakona Village School Road Rehab 2011 WFL Alaska PDF icon ak-den-2009(4).pdf
AK PFH 42-1(5) / 43-1(6) Control Lake - Thorne Bay Road and North Prince of Wales Road - Part B 2002 WFL Alaska PDF icon ak-pfh-42-1(5)-43-1(6).pdf
AK PRA KEFJ 10(3) Exit Glacier Road MP 7.0 to 8.0 - Schedule B 2012 WFL Alaska PDF icon ak-pra-kefj-10(3)-b.pdf
AK FNSB TANANA(1) Tanana River Recreation Access Improvements WFL Alaska
AK DEN 2009(11) Atka Roads Surfacing - Schedule A 2010 WFL Alaska PDF icon ak-den-2009(11)-a.pdf
AK DEN 2007(2) Coffman Cove Dock 2009 WFL Alaska PDF icon ak-den-2007(2).pdf
AK DEN 2009(17) Kwethluk-Jay Hammond Road Repairs - Schedule A 2011 WFL Alaska PDF icon ak-den-2009(17)-a.pdf
AK PRA KEFJ 10(3) Exit Glacier Road MP 7.0 to 8.0 - Schedule C 2012 WFL Alaska PDF icon ak-pra-kefj-10(3)-c.pdf
AK BLM (1) Yakataga Bridge Replacement, Schedule A 2005 WFL Alaska PDF icon ak-blm-(1).pdf
AK PRA-DENA 10(20) Denali Park Road (Mile 1-15 Culvert Replacement) 2005 WFL Alaska PDF icon ak-pra-dena-10(20).pdf
AK DEN 2009(11) Atka Roads Surfacing - Schedule B 2010 WFL Alaska PDF icon ak-den-2009(11)-b.pdf
AK PFH 40(3) Jenny Creek Bridge 2010 WFL Alaska PDF icon ak-pfh-40(3).pdf
AK PFH 44-1(4) Coffman Cove Road, Paving 2007 WFL Alaska PDF icon ak-pfh-44-1(4).pdf
AK DEN 2009(17) Kwethluk-Jay Hammond Road Repairs - Schedule B 2011 WFL Alaska PDF icon ak-den-2009(17)-b.pdf
AK PRA-DENA 10(14) Denali Park Road (Savage River Turnaround & Tattler Site) 2003 WFL Alaska PDF icon ak-pra-dena-10(14).pdf
AK PFH 44-1(2) Coffman Cove Road, Phase 2, Schedule A 2006 WFL Alaska PDF icon ak-pfh-44-1(2).pdf
AK PRA-DENA 10(16) Denali Park Road Milepost 70-72 2004 WFL Alaska PDF icon ak-pra-dena-10(16).pdf
AK NPS DENA 10(47) & 10(48) Repair Two Denali Park Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9 2021 WFL Alaska PDF icon ak-nps-dena-10-47-t.pdf
AK PRA-GLBA 10(2) Main Park Road, Phase II 2001 WFL Alaska PDF icon ak-pra-glba-10(2).pdf

Pages