You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort descending Bid Tabulation Documents
AK PFH 44-1(4) Coffman Cove Road, Paving 2007 WFL Alaska PDF icon ak-pfh-44-1(4).pdf
AK DEN 2010(3) Tununak Community Streets Schedule B 2014 WFL Alaska PDF icon ak-den-2010(3)-sched-b.pdf
AK NPS KLGO 10(1) Repair Dyea Flats Road and Slide Cemetery Road 2016 WFL Alaska PDF icon ak-nps-klgo-10(1).pdf
AK PRA-DENA 10(16) Denali Park Road Milepost 70-72 2004 WFL Alaska PDF icon ak-pra-dena-10(16).pdf
AK PRA DENA 10(34) Eagle's Nest Corner at MP 67.5 2013 WFL Alaska PDF icon ak-pra-dena-10(34).pdf
AK FNSB TANANA(1) Tanana River Recreation Access Improvements WFL Alaska
AK PFH 44-1(2) Coffman Cove Road, Phase 2, Schedule A 2006 WFL Alaska PDF icon ak-pfh-44-1(2).pdf
AK DEN 2010(3) Tununak Community Streets Schedule C 2014 WFL Alaska PDF icon ak-den-2010(3)-sched-c.pdf
AK PRA DENA 10(27) Rehab Unsafe Road Sections of the Denali Park Road - Schedule A 2010 WFL Alaska PDF icon ak-pra-dena-10(27)-a.pdf
AK PRA DENA 10(13) Denali Park Road, Sanctuary Area 2013 WFL Alaska PDF icon ak-pra-dena-10(13).pdf
AK FS TNF 2(1) Auke Recreation Roadway Rehab 2017 WFL Alaska PDF icon ak-fs-tnf-2(1).pdf
AK DOT 135(2) Glenn Highway Chickaloon Bridge 2015 WFL Alaska PDF icon ak-dot-135(2).pdf
AK EMK 2005(1) King Cove Roads, All Schedules 2007 WFL Alaska PDF icon ak-emk-2005(1).pdf
AK PFH 44-1(1) Coffman Cove Road, Schedule A 2003 WFL Alaska PDF icon ak-pfh-44-1(1)-a.pdf
AK PRA DENA 10(27) Rehab Unsafe Road Sections of the Denali Park Road - Schedule B 2010 WFL Alaska PDF icon ak-pra-dena-10(27)-b.pdf
AK BIA AIR 7(8) Walden Point Road Paving 2011 WFL Alaska PDF icon ak-bia-air-7(8).pdf
AK TTP CHIC 2013(1) Dene Tene Pedestrian Path 2017 WFL Alaska PDF icon ak-ttp-chic-2013(1).pdf
AK DOT 135(5) Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77.4 to 87.2 2017 WFL Alaska PDF icon ak-dot-135(5).pdf
AK PFH 44-1(1) Coffman Cove Road, Schedule B 2003 WFL Alaska PDF icon ak-pfh-44-1(1)-b.pdf
AK NPS DENA 10(44) Repave Denali Park Road MP 3.4 To 14.7, Phase II 2017 WFL Alaska PDF icon ak-nps-dena-10(44).pdf
AK PRA DENA 10(26) Rock Creek Culvert 2013 WFL Alaska PDF icon ak-pra-dena-10(26).pdf
AK DEN 2009(7) Manley Hot Springs Community Streets 2011 WFL Alaska PDF icon ak-den-2009(7).pdf
AK PRA-DENA 10(21)(22) Toklat Reststop Bank Stabilization, Denali Park Road Mile 68 Slide Repair 2005 WFL Alaska PDF icon ak-pra-dena-10(21)(22).pdf
AK NPS DENA 10(47) & 10(48) Repair Two Denali Park Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9 2021 WFL Alaska PDF icon ak-nps-dena-10-47-t.pdf
AK DEN 2011(1) Metlakatla-Walden Point Connector Road 2011 WFL Alaska PDF icon ak-den-2011(1).pdf

Pages