You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Numbersort descending Project Name Fiscal Year Division State Bid Tabulation Documents
AK DEN 2009(5) Akiak Roads Rehabilitation - Schedule B 2011 WFL Alaska PDF icon ak-den-2009(5)-b.pdf
AK DEN 2009(7) Manley Hot Springs Community Streets 2011 WFL Alaska PDF icon ak-den-2009(7).pdf
AK DEN 2009(8) Manokotak Heights Road Reconstruction - Schedule A 2013 WFL Alaska PDF icon ak-den-2009(8)-a.pdf
AK DEN 2009(8) Manokotak Heights Road Reconstruction - Schedule B 2013 WFL Alaska PDF icon ak-den-2009(8)-b.pdf
AK DEN 2009(8) Manokotak Heights Road Reconstruction - Schedule C 2013 WFL Alaska PDF icon ak-den-2009(8)-c.pdf
AK DEN 2010(3) Tununak Community Streets Schedule A 2014 WFL Alaska PDF icon ak-den-2010(3)-sched-a.pdf
AK DEN 2010(3) Tununak Community Streets Schedule B 2014 WFL Alaska PDF icon ak-den-2010(3)-sched-b.pdf
AK DEN 2010(3) Tununak Community Streets Schedule C 2014 WFL Alaska PDF icon ak-den-2010(3)-sched-c.pdf
AK DEN 2011(1) Metlakatla-Walden Point Connector Road 2011 WFL Alaska PDF icon ak-den-2011(1).pdf
AK DOT 135(2) Glenn Highway Chickaloon Bridge 2015 WFL Alaska PDF icon ak-dot-135(2).pdf
AK DOT 135(5) Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77.4 to 87.2 2017 WFL Alaska PDF icon ak-dot-135(5).pdf
AK DOT 135(6) Glenn Highway Rehabilitation, Kings River Bridge Section MP 66.0 to MP 67.2 WFL Alaska
AK DOT 2013(1) Klawock Community Streets Paving 2014 WFL Alaska PDF icon ak-dot-2013(1).pdf
AK EMK 2005(1) King Cove Roads, All Schedules 2007 WFL Alaska PDF icon ak-emk-2005(1).pdf
AK FNSB TANANA(1) Tanana River Recreation Access Improvements WFL Alaska
AK FS CNF 1015(1) Russian River Campground Access Phase 1 2017 WFL Alaska PDF icon ak-fs-cnf-1015(1).pdf
AK FS TNF 2(1) Auke Recreation Roadway Rehab 2017 WFL Alaska PDF icon ak-fs-tnf-2(1).pdf
AK IRR FORT 1002(1) Ivars Road Bridge Replacement 2016 WFL Alaska PDF icon ak-irr-fort-1002(1).pdf
AK IRR WRAN 2012(1) Weber Street Reconstruction 2014 WFL Alaska PDF icon ak-irr-wran-2012(1).pdf
AK NPS DENA 10(41) Repave Denali Park Road MP 3.4 to 14.9 2016 WFL Alaska PDF icon ak-nps-dena-10(41)-a.pdf, PDF icon ak-nps-dena-10(41)-b.pdf, PDF icon ak-nps-dena-10(41)-c.pdf
AK NPS DENA 10(44) Repave Denali Park Road MP 3.4 To 14.7, Phase II 2017 WFL Alaska PDF icon ak-nps-dena-10(44).pdf
AK NPS DENA 10(49) Polychrome Area Improvements WFL Alaska
AK NPS KEFJ 10(4) Herman Leirer Road (Exit Glacier Road) Flood Mitigation 2016 WFL Alaska PDF icon ak-nps-kefj-10(4).pdf
AK NPS KEFJ 10(5) Exit Glacier Road Bridge Rehabilitation 2018 WFL Alaska PDF icon ak-nps-kefj-10(5).pdf
AK NPS KLGO 10(1) Repair Dyea Flats Road and Slide Cemetery Road 2016 WFL Alaska PDF icon ak-nps-klgo-10(1).pdf

Pages