You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Divisionsort descending State Bid Tabulation Documents
OR PFH 60(2) Powers to Agness Highway 2010 WFL Oregon PDF icon or-pfh-60(2).pdf
WA NPS OLYM 2016(1) Spruce Railroad Trail Segment A 2017 WFL Washington PDF icon wa-nps-olym-2016(1).pdf
ID PFH 94-1(1) Meadow Creek Road 2007 WFL Idaho PDF icon id-pfh-94-1(1).pdf
ID PFH 82-1(1) Atlanta Road 2001 WFL Idaho PDF icon id-pfh-82-1(1).pdf
AK DOT 135(2) Glenn Highway Chickaloon Bridge 2015 WFL Alaska PDF icon ak-dot-135(2).pdf
OR BLM ERFO 151-3301 Wells Creek Landslide 2017 WFL Oregon PDF icon or-blm-erfo-151-3301.pdf
WA FS ERFO 2015(1)-20(1) Wells Creek Repairs 2018 WFL Washington PDF icon wa-fs-erfo-2015(1)-20(1).pdf
MT RRP RERO 105(1) Lower Lake Roads & Parking, Schedule B 2008 WFL Montana PDF icon mt-rrp-rero-105(1)-b.pdf
MT PFH 61-1(8) North Fork Flathead River Road Slide Repair 2000 WFL Montana PDF icon mt-pfh-61-1(8).pdf
OR FS ERFO 121-1901 Agness Road Slide Repair at FSR 3348 2013 WFL Oregon PDF icon or-fs-erfo-121-1901.pdf
MT PHILLIPS 364(1) Short Oil Road 2020 WFL Montana PDF icon mt-phillips-364-1.pdf
MT OMAD 18(40) Minuteman Missile Base Roads 2007 WFL Montana PDF icon mt-omad-18(40).pdf
WA NPS OLYM 12(1) Heart O' the Hills Entrance Station Improvements 2021 WFL Washington PDF icon wa-nps-olym-12-1.pdf
AK DEN 2009(13) Tevyraq Railroad Tram 2013 WFL Alaska PDF icon ak-den-2009(13).pdf
OR PFH 186-1(1) Jordan Road 2001 WFL Oregon PDF icon or-pfh-186-1(1).pdf
WA NPS NOCA 101(4) Cascade River Road MP 21.8 Boston Creek 2015 WFL Washington PDF icon wa-nps-noca-101(4).pdf
MT OMAD 18(49) Minuteman Missile Base Roads, Schedule D 2010 WFL Montana PDF icon mt-omad-18(49)-d.pdf
MT FLATHEAD 543(1) Pleasant Valley Road Relocation 2016 WFL Montana PDF icon mt-flathead-543(1)-a.pdf, PDF icon mt-flathead-543(1)-b.pdf
MT FLATHEAD 917(2) Blacktail Road Surface Improvement Phase 2 2017 WFL Montana PDF icon mt-flathead-917(2).pdf
AK TTP CHIC 2013(1) Dene Tene Pedestrian Path 2017 WFL Alaska PDF icon ak-ttp-chic-2013(1).pdf
WA NPS OLYM 2015(4) Spruce Railroad Trail Segment C 2016 WFL Washington PDF icon wa-nps-olym-2015(4).pdf
OR PFH 146(4) Palmer Junction Road - MP 0.0 TO 15.1 2016 WFL Oregon PDF icon or-pfh-146(4).pdf
AK FS TNF 2(1) Auke Recreation Roadway Rehab 2017 WFL Alaska PDF icon ak-fs-tnf-2(1).pdf
OR PRA CRLA 2013(1) Crater Lake National Park Rockfall Mitigation, Phase I and II 2014 WFL Oregon PDF icon or-pra-crla-2013(1).pdf
AK DOT 135(5) Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77.4 to 87.2 2017 WFL Alaska PDF icon ak-dot-135(5).pdf

Pages