You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Year Division Statesort descending Bid Tabulation Documents
Flowery Trail Road 2002 PDF icon wa-pfh-158-1(3).pdf
PRA-NATR 2A15 Natchez Trace Parkway Bridges Over Lindsey Creek - Threet Creek - And 2007 EFL Alabama PDF icon natr-2a15.pdf
PRA-NATR 2B5 Natchez Trace Parkway John Coffee Memorial Bridge 2014 EFL Alabama PDF icon pra-natr-2b5.pdf
PRA-NATR-2B4 Natchez Trace Parkway 2013 EFL Alabama PDF icon pra-natr-2b4.pdf
RRP-WLR 10(2) Wheeler National Wildlife Refuge 2011 EFL Alabama PDF icon rrp-wlr_10(2).pdf
PRA-HOBE 10(1) Tallapoosa Horseshoe Bend National Military Park 2006 EFL Alabama PDF icon pra_hobe.pdf
FS AL 337(1) Pond Creek Under Rt337 Culvert Replacement In The Conecuh National 2007 EFL Alabama PDF icon dtfh71-07-b-00044.pdf
SER PMS FY17(1) US National Park Service Southeast Region Multiple Parks Pavement Preservation Project 2017 EFL Alabama PDF icon SER-PMS-FY17(1).pdf
PRA-NATR 2B5_2nd Adv John Coffee Memorial Bridge Over Tennessee River 2016 EFL Alabama PDF icon pra-natr-2b5.pdf
PRA-NATR 2A17 Pavement Rehabilitation, MP 331.19 TO 340.86 2015 EFL Alabama PDF icon pra-natr-2a17.pdf
PRA-NATR 3D31 - E10 Natchez Trace Parkway 2014 EFL Alabama PDF icon pra-natr-3d31-e10.pdf
AK DOT 2013(1) Klawock Community Streets Paving 2014 WFL Alaska PDF icon ak-dot-2013(1).pdf
AK DEN 2010(3) Tununak Community Streets Schedule C 2014 WFL Alaska PDF icon ak-den-2010(3)-sched-c.pdf
AK PRA DENA 10(27) Rehab Unsafe Road Sections of the Denali Park Road - Schedule B 2010 WFL Alaska PDF icon ak-pra-dena-10(27)-b.pdf
AK DEN 2009(8) Manokotak Heights Road Reconstruction - Schedule C 2013 WFL Alaska PDF icon ak-den-2009(8)-c.pdf
AK DEN 2007(1) Kobuk Bridge Replacement 2009 WFL Alaska PDF icon ak-den-2007(1).pdf
AK PFH 9-1(9) Big Salt Lake Road, Option 1 1999 WFL Alaska PDF icon ak-pfh-9-1(9)-1.pdf
AK PRA DENA 10(26) Rock Creek Culvert 2013 WFL Alaska PDF icon ak-pra-dena-10(26).pdf
AK PFH 42-1(6) Control Lake - Thorne Bay, Sandy Beach Road - Part A 2002 WFL Alaska PDF icon ak-pfh-42-1(6).pdf
AK NPS DENA 10(44) Repave Denali Park Road MP 3.4 To 14.7, Phase II 2017 WFL Alaska PDF icon ak-nps-dena-10(44).pdf
AK PFH 9-1(9) Big Salt Lake Road, Option 2 1999 WFL Alaska PDF icon ak-pfh-9-1(9)-2.pdf
AK PFH 42-1(6)|AK PFH 42-1(5)|AK 43-1(6) Control Lake - Thorne Bay, Sandy Beach, North Prince of Wales - Thorne Bay Road - Summary 2002 WFL Alaska PDF icon ak-pfh-42-1(6)-etc.pdf
AK NPS KEFJ 10(4) Herman Leirer Road (Exit Glacier Road) Flood Mitigation 2016 WFL Alaska PDF icon ak-nps-kefj-10(4).pdf
AK PFH 40-1(1) Kake to Seal Point Road 2011 WFL Alaska PDF icon ak-pfh-40-1(1).pdf
AK NPS DENA 10(41) Repave Denali Park Road MP 3.4 to 14.9 2016 WFL Alaska PDF icon ak-nps-dena-10(41)-a.pdf, PDF icon ak-nps-dena-10(41)-b.pdf, PDF icon ak-nps-dena-10(41)-c.pdf

Pages