You are here

Bid Tabulations

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.

Project Number Project Name Fiscal Yearsort ascending Division State Bid Tabulation Documents
AK NPS DENA 10(41) Repave Denali Park Road MP 3.4 to 14.9 2016 WFL Alaska PDF icon ak-nps-dena-10(41)-a.pdf, PDF icon ak-nps-dena-10(41)-b.pdf, PDF icon ak-nps-dena-10(41)-c.pdf
AK NPS SITK 2013(1) Replace Indian River Bridge 2016 WFL Alaska PDF icon ak-nps-sitk-2013(1).pdf
GA FLTP CE WFG LOCK(1) Walter F. George Lock and Dam 2016 EFL Georgia PDF icon ga-fltp-ce-wfg-lock(1).pdf
FTNP-NATR 3C12, D32 NATCHEZ TRACE PARKWAY 3C12, D32 2016 EFL Mississippi PDF icon ftnp-natr-3c12-d32.pdf
MT STILLWATER 207(1) West Rosebud Creek Road Reconstruction 2016 WFL Montana PDF icon mt-stillwater-207(1).pdf
ID PFH 91(1) Williams Creek (Shoup) Bridge Replacement 2016 WFL Idaho
MT DOD 16(54) Minuteman Missile Base Roads 2016 WFL Montana PDF icon mt-dod-16(54)-c.pdf, PDF icon mt-dod-16(54)-b.pdf, PDF icon mt-dod-16(54)-a.pdf
WA LEWIS 707(1) Cispus Road Improvements 2016 WFL Washington PDF icon wa-lewis-707(1).pdf
NP-SER PMS FY16(2) NPS SOUTHEAST REGION PAVEMENT PRESERVATION 2016 EFL South Carolina PDF icon np-ser-pms-fy16(2).pdf
NP-SHIL 11(1), 18(1) SHILOH NATIONAL MILITARY PARK 2016 EFL Tennessee PDF icon np-shil-11(1)-18(1).pdf
OR PFH 146(4) Palmer Junction Road - MP 0.0 TO 15.1 2016 WFL Oregon PDF icon or-pfh-146(4).pdf
IL NPS PRES 15(1) Pavement Preservation Illinois 2016 WFL Illinois PDF icon il-nps-pres-15(1).pdf
VI NP-VIIS 20(1) Construction of Gabion Walls Along North Shore Road 2016 EFL Virgin Islands PDF icon np-viis-20(1).pdf
OR FWS ORCO 2015(2); OR FWS ORCO 2014(1) Alder Island Parking Lot; Two Rivers Peninsula Parking Lot 2016 WFL Oregon PDF icon or-fws-orco-2015(2)-or-fws-orco-2014(1).pdf
FTNP-FOPU 10(3) REPLACEMENT OF FORT PULASKI ENTRANCE BRIDGE 2016 EFL Georgia PDF icon ftnp-fopu-10(3).pdf
WA NPS MORA 123(1) Rockfall Mitigation at SR123 2016 WFL Washington PDF icon wa-nps-mora-123(1).pdf
IA NPS PRES 15(1) Pavement Preservation Iowa 2016 WFL Iowa PDF icon ia-nps-pres-15(1).pdf
WA DOT 401(1) Dismal Nitch/Megler Safety Rest Area and Access Improvement 2016 WFL Washington PDF icon wa-dot-401(1).pdf
FW-TAMA 10(1), 900(1) Tamarac National Wildlife Refuge 2016 EFL Minnesota PDF icon fw-tama-10(1)-900(1).pdf
ID CASCADE LS DR(1) Lakeshore Drive Phase II 2016 WFL Idaho PDF icon id-cascade-ls-dr(1).pdf
FW ACBA 100(1) Ace Basin National Wildlife 2016 EFL South Carolina PDF icon fw-acba-100(1).pdf
AK NPS KEFJ 10(4) Herman Leirer Road (Exit Glacier Road) Flood Mitigation 2016 WFL Alaska PDF icon ak-nps-kefj-10(4).pdf
NP-OCMU 10(2) Ocmulgee National Monument 2016 EFL Georgia PDF icon np-ocmu-10(2).pdf
MT DOT 236(1) South of Big Sandy 2016 WFL Montana PDF icon mt-dot-236(1).pdf
MN NPS PRES 15(1) Pavement Preservation Minnesota 2016 WFL Minnesota PDF icon mn-nps-pres-15(1).pdf

Pages