Bridge Preventive Maintenance and Rehabilitation
Project Description
Structure rehabilitation and preventive maintenance, scour protection of structures, roadway pavement maintenance and guardrail installation at four bridges sites (Adams Creek Bridge, Bushkill Creek Bridge, Conashaugh Creek Culver, and Toms Creek Briidge). Work items include roadway excavation, riprap, articulated concrete block revetment, concrete repair, concrete surface sealing, cleaning and resealing joints, expansion joints repairs with strip seal, steel bridge railing, steel girder spot painting, steel-backed timber guardrail, tree planting, pavement markings and other miscellaneous work. Project is located on US Route 209, between I-80 in the south and US Route 206 in the north. US Route 209 will remain open to traffic during the construction.
Anticipated Timeline
Advertisement and Award: Spring 2020 - Summer 2020
Construction: Spring 2021 - Fall 2022