Road and Parking Area Pavement Rehabilitation and New Bridge Construction at Still Creek
Project Description
Replacement of damaged perched culverts with a new 70-foot long bridge over Still Creek, roadway and parking area pavement rehabilitation, drainage improvements, and other work. Work items include pavement removal and roadway excavation, aggregate base, asphalt concrete pavement, structural concrete, precast, prestressed concrete box beams, steel-backed timber bridge railing, Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS) stone masonry faced-abutments, box culverts construction and pipe culvert installation, concrete headwalls, steel-backed timber guardrail installation, striping, utility relocation, and other miscellaneous work. Project can be accessed by Greenbelt Road (State Route 193) from the north and by Good Luck Road from the south.
Anticipated Timeline
Advertisement and Award: Winter 2018/2019
Construction: Summer 2019 - Spring 2022