Ohio Drive and West Basin Drive Pavement Rehabilitation
Project Description
This project consists of resurfacing of 0.77 miles of Ohio Drive (between East Basin Drive and Independence Avenue), 0.24 miles of West Basin Drive (between Ohio Drive and Independence Avenue), and the loop at Independence and Ohio Drive. The work will include milling and overlaying 2-inches of the existing pavement, full depth patch repair, wedge and leveling, pavement markings, replacing and refurbishing (painting) light poles, and other miscellaneous work. There is severe rutting at the intersection of Ohio Drive and Independence Ave. in the right lane due to bus traffic. Minimizing inconvenience to the traveling public during the construction is a major priority for the project.
Anticipated Timeline
Advertisement: Spring 2023
Construction: 2023