General
Legacy ID
431
WFL Plan Review Process
The PS&E Plan Review Process consists of the following steps:
CFT & Partner Milestone Review Procedures
WFLHD Supplement 9.6.4-1 Purpose: This supplement describes the procedures for submitting a project package of plans, specifications, and cost estimate (PS&E package) for review at project milestones, expectations for milestone reviews, and the resolution of comments. Approved: 2/...PS&E Development at Various Stages of Design (WFL)
WFLHD Supplement 9.6.3-1 Purpose: This supplement describes the design process in WFLHD. Approved: 2/25/2021 Pages: 1 References: PS&E Continuum Project Development Workflow Design Process ActivitiesSealing & Signing of Documents Prepared by A/E Firms
WFLHD Supplement 9.6.1-2 Purpose: This supplement specifies the type of documents that are required to be sealed by a licensed professional for highway design, construction, and related services, and the requirements for signing and sealing those documents. Approved: 10/18/2018 Pages...Land Use Determination for R/W Coordination
WFLHD Supplement 9.5.9-1 Purpose: This supplement explains how to evaluate and provide design information to Realty Services for the purpose of obtaining the proper right-of-way and documenting the requirements. Approved: 4/15/2015 Pages: 5 Documents: Land Use Example...Documenting Design Exceptions (WFL)
Supplement 9.1.3.4-1 Purpose: This supplement provided guidance in documenting exceptions to Highway Design Standards within WFLHD using the WFLHD-3 (Highway Design Standards) form. Note: Design exceptions are now documented using the Highway Design Standards form. Approved: 9/...CFL Highway Design Forms
These forms are prepared for each project during the design process in the Central Federal Lands Highway Division:
Design Documentation Forms
- Highway Design Standards Form - Form...
HDS Memo
Rev: 18-May-2020
Use this memo instead of the Highway Design Standards Form for the following project types:
Preventative MaintenanceSpot Improvements less than 500 feet in lengthNon-roadway work onlyFill in the Project, select the appropriate Designer from the drop-down menu, and...