General
Standard Format for Plans (WFL)
WFLHD Supplement 9.6.5-1 Purpose: This supplement explains the standard format, drafting standards, and organization of the project plans created within and for WFLHD. Approved: < DRAFT > Pages: 17 References: Sample Plans FLH CADD Level Library Tabulation spreadsheets...WFLHD-2
Revised: 15-Nov-2024
PS&E Assembly and ReviewTo be completed prior to project Signoff.
Note: This form is not viewable within a web browser. Download the document for viewing and use.
Signoff Folder

Signoff Package Checklist
Revised: 26-Mar-2025
The documents and conditions included in this checklist must be met prior to forwarding PS&E package to Acquisitions after Signoff. The first page contains a summary of the Signoff documents.
Title Sheet Signatures
WFLHD Supplement 9.6.4.4-1 Purpose: The purpose of this supplement is to provide guidance for obtaining approval of the project title sheet and preparing a digital version of the final title sheet. Approved: 12/10/2020 Pages: 1 References: Sample Title SheetsRespond to Comments with Acrobat
Step 1 Set Comment Status
Open the archive version of the PDF (i.e. filename ends with "_archive.pdf")
Select Comment from the Tools shortcut.
Archive Completed Review
Step 1 Saving file as an "Archive Copy"
Step 1A
Open PDF containing review comments
If deadline date was NOT established:
Select Check for New Comments
CFL Stormwater Practitioners Guide
The FHWA-CFLHD is proposing refinements to how its Permanent Stormwater Management Design Process is implemented. This section aims to document the permanent Stormwater Design process so that projects can consistently evaluate stormwater BMPs during project development.
Contract Inspector (CI) Handbook
The Contract Inspector Handbook provides technical guidance and explains potential Contract Inspector duties. It outlines common professional relationships, expected communication skills, limitation of authority, required equipment, and methods of record-keeping.