USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation

General

Legacy ID
16

Northeast Regional

Construction IDIQ MATOC

Construction Task Order Contracts were awarded to cover highway and/or bridge construction services with incidental design services within the Northeast states of the United States. These states will include but are not limited to Pennsylvania,...

Mid-West Regional

Construction IDIQ MATOC

Construction Task Order Contracts were awarded to cover highway and/or bridge construction services with incidental design services within the Mid-West states of the United States.   These states will include, but are not limited to,...

Mid-Atlantic Regional

Construction IDIQ MATOC

Construction Task Order Contracts were awarded to cover highway and/or bridge construction services with incidental design services within the Mid-Atlantic states of the United States.   These states will include, but are not limited...

WFL Cell Libraries

The cell libraries are available for download through the FLH Workspace.  The following Microstation cell libraries are used within WFLHD:

  • Work_dd WFL default cell library containing standard symbols...

Design Process Activities

.group:after { content: "."; display: block; height: 0; clear: both; visibility: hidden; } .third { float: left; width: 33%; } p.head1, p.head2, p.head3 { font-weight: bold; color: #fff; padding: 5px; } p.head1 { background-color: #360; margin-right: 10px; } p.head2 {...

Project Development Workflow

This flowchart provides a high-level overview of the project development process.  Four design phases 30%, 70%, 95%, and 100% are shown in the flowchart.  Complex projects may also include an Intermediate (50%) design phase.

 

...

PS&E Continuum

Rev 11 Mar 2025

Table showing the progression of each major PS&E deliverable throughout the project development phases.