General

Legacy ID
21

PE Hold File Checklist

Rev: 9-Mar-2022

Checklist for transmittal of design information to Construction to be completed prior to award date.

Attach the Important Notice Letter when including CADD files.

Design Narrative (WFL)

Rev: Jul-2020

Template for documenting project information about the project for use during construction.

Design Narrative Creation

WFLHD Supplement 9.6.6.6-1 Purpose: The purpose of this Supplement is to describe the Design Narrative prepared for the Construction Project Engineer. Approved: 12/15/2006 Pages: 2

CADD Tracking

Rev: Jan-2014

Document used for tracking information used by the roadway design software for a specific project.  The current version of the form is set up for GEOPAK.  See also the example.

Design Book Index

Rev: Jul-2018

Index for Design Book with typical items included in each section.

Computation of Quantities

WFLHD Supplement 9.6.6.1-1 Purpose: The purpose of this Supplement is to clarify how various quantities are to be calculated. Approved: 12/15/2006 Pages: 1

Standard Format for Plans (WFL)

WFLHD Supplement 9.6.5-1 Purpose: This supplement explains the standard format, drafting standards, and organization of the project plans created within and for WFLHD. Approved: < DRAFT > Pages: 17 References: Sample Plans FLH CADD Level Library Tabulation spreadsheets...

WFLHD-2

Revised: 15-Nov-2024

PS&E Assembly and Review

To be completed prior to project Signoff.

Note:  This form is not viewable within a web browser.  Download the document for viewing and use.

Signoff Package Checklist

Revised: 26-Mar-2025

The documents and conditions included in this checklist must be met prior to forwarding PS&E package to Acquisitions after Signoff. The first page contains a summary of the Signoff documents.