FHWA Research Projects Search
Displaying 1 - 20 of 1071
Project Name Sort descending | FHWA AMRP Program | Project ID | Status | Start Date | End Date |
---|---|---|---|---|---|
2020 Global Benchmarking Studies Global Benchmarking Program | Policy Analysis and Global Outreach | FHWA-PROJ-20-0031 | Active | ||
2021 Vehicle Occupancy Data | Highway and Transportation Data | FHWA-PROJ-20-0010 | Temporarily Suspended | ||
24th and 25th C&P Report Editing, Layout, and 508 Compliance | Policy Analysis and Global Outreach | FHWA-PROJ-19-0073 | Active | ||
26th C&P Report Editing, Layout, and 508 Compliance | Policy Analysis and Global Outreach | FHWA-PROJ-21-0030 | Proposed | ||
500 Series Forms Implementation | Highway and Transportation Data | FHWA-PROJ-20-0037 | Active | ||
A Multiple-Sensor Wireless Network for Bridge Structural Health Monitoring | Structures | FHWA-PROJ-09-0095 | Completed | ||
A Remote, Self-Sustained System for Monitoring Water Quality Near Highways | Exploratory Advanced Research | FHWA-PROJ-13-0108 | Completed | ||
A Self-Sensing Adaptive Material for a New Generation of Multifunctional Highway Bridge Bearing Systems | Pavements and Materials, Structures | FHWA-PROJ-13-0106 | Completed | ||
Abutment Interface Experiments for Integrated Approaches | Geotechnical and Hydraulics | FHWA-PROJ-12-0004 | Completed | ||
Accelerated Determination of Alkali-Silica Reaction Susceptibility During Concrete Prism Testing Through Nonlinear Resonance Ultrasonic Spectroscopy | Pavements and Materials | FHWA-PROJ-09-0023 | Completed | ||
Accelerated Process: Measurement and Modeling Techniques (23 CFR 772) | Accelerating Project Delivery, Modeling and Analysis Tools | FHWA-PROJ-16-0066 | Completed | ||
Acquiring Connected and Automated Vehicle Performance Datasets | Automation and Connectivity | FHWA-PROJ-21-0062 | Active | ||
Active Traffic Management Study | Safety Design and Operations | FHWA-PROJ-10-0007 | Completed | ||
Active Transportation Funding and Finance Toolkit | Planning for Bicycle and Pedestrian Safety, Connectivity, and Multimodal Mobility, including for Underserved Communities | FHWA-PROJ-20-0085 | Completed | ||
Adaptive Control System Lite - Phase II | Transportation Systems Management and Operations | FHWA-PROJ-09-0096 | Completed | ||
Addressing Challenges in Intelligent Construction Systems and Technologies | Construction and Project Management | FHWA-PROJ-13-0104 | Completed | ||
Addressing Changing Demographics in Environmental Justice Analysis, State of Practice | Planning for Bicycle and Pedestrian Safety, Connectivity, and Multimodal Mobility, including for Underserved Communities | FHWA-PROJ-17-0035 | Completed | ||
Addressing National Pavement Performance Needs With the Accelerated Loading Facility | Pavements and Materials | FHWA-PROJ-11-0204 | Completed | ||
Addressing the Challenges and the Return on Investment for Paperless Project Delivery (e-Construction) | Construction and Project Management | FHWA-PROJ-14-0019 | Completed | ||
Addressing Truck Emissions and Noise at Truck Freight Bottlenecks | Modeling and Analysis Tools | FHWA-PROJ-20-0039 | Completed |