Publication Information
The primary aim of the partial-depth spall repair study was to determine the most effective and economical materials and procedures for placing quality, long-lasting partial-depth patches in jointed concrete pavements. A secondary objective of the study was to identify any performance-related material tests that would enhance the material selection process and provide a better guarantee of patch performance.