Performance Evaluation of Prestressing Strands for Concrete Bridges With Chloride Contaminated Grout
Project Information
A research program will be conducted to obtain a preliminary estimate of a chloride threshold value for corrosion initiation for prestressing strands.
Goals
The key project objective is to conduct research on prestressing strands grouted with samples of cement grout containing different levels of chloride to obtain a preliminary estimate of a chloride threshold value for corrosion initiation.
- Infrastructure
- FY 2002-2022 / Infrastructure / Structures
- Long-Term Bridge Performance
AMRP = Annual Modal Research Plan