Geosynthetic Reinforced Soil Design
Project Information
The work involves the refinement to current Geosynthetic Reinforced Soil (GRS) Integrated Bridge System (IBS) guidance and development of GRS wall design recommendations.
Goals:
Updates to the current design methodology and development of GRS wall recommendations.
- Infrastructure
- FY 2002-2022 / Infrastructure / Geotechnical and Hydraulics
- Geotechnology Research Program
Refinement to current geosynthetic reinforced soil (GRS) Integrated Bridge System (IBS) guidance and development of GRS wall design recommendations.
The final project output - FHWA-HRT-17-080, Design and Construction Guidelines for Geosynthetic Reinforced Soil Abutments and Integrated
Bridge Systems.