Condition Assessment of a Mechanically Stabilized Earth (MSE) Wall

Project Information

Project ID: 
FHWA-PROJ-12-0103
Project Status: 
Completed
Start Date: 
Monday, July 2, 2012
End Date: 
Wednesday, December 31, 2014
FHWA Program: 
Infrastructure
FHWA Subprogram: 
Structures
TRT Terms: 
Transportation; Materials; Infrastructure; Research; Testing; Planning and Design
FHWA Discipline: 
Design, Generalist, Geotechnical, Structures
Subject Area: 
Bridges and other structures, Construction, Design, Geotechnology, Maintenance and Preservation, Research

Contact Information

First Name: 
Jennifer
Last Name: 
Nicks
Telephone: 
(202) 493-3075
Email Address: 
Team: 
Bridge Engineering Team
Office:
Office of Infrastructure Research and Development
Office Code: 
HRDI-40

Project Details

Project Description: 

The Virginia Department of Transportation (VDOT) is currently undergoing construction of the Hot Lanes project, and as part of the realignment between Interstates 495N and 66W, an existing mechanically stabilized earth (MSE) retaining wall bridge ramp was demolished in July 2012. The MSE wall, built with galvanized steel bar mat reinforcement connected to a concrete panel facing, was constructed in 1976. The age of the wall makes this a good candidate for assessment and drawing conclusions to similar walls in similar environments.

Goals 

The main objective of this forensic examination is to investigate the condition of steel bar mat reinforcements as a function of wall location and backfill quality for a mechanically stabilized earth (MSE) wall bridge ramp.