Download All Research Projects in JSON Format Project Name/ID Keyword Status - Any -ActiveCompletedProgrammedProposedTemporarily SuspendedTerminated Contact Laboratory - Any -Aerodynamics LaboratoryAggregate and Petrographic LaboratoryAsphalt Binder and Mixtures Laboratory (ABML)Chemistry LaboratoryCoatings and Corrosion LaboratoryConcrete LaboratoryFederal Outdoor Impact LaboratoryGeometric Design LaboratoryGeotechnical LaboratoryHuman Factors LaboratoryIntelligent Intersection Traffic Control LaboratoryJ. Sterling Jones Hydraulics Research LaboratoryNondestructive Evaluation (NDE) LaboratoryPavement Testing FacilitySafety Training and Analysis Center (STAC)Saxton Transportation Operations LaboratoryStructures Laboratory FHWA Program Area - Any -CorporateCross-TopicDesignated Grant ProgramsExploratory Advanced ResearchFederal and Indian LandsInfrastructureInnovative Program DeliveryIntelligent Transportation SystemsOperationsPlanning, Environment, and RealtyPolicySafetySmall Business Innovation Research FHWA AMRP Program - Any -Accelerated Implementation and Deployment of Pavement TechnologiesAdvanced Transportation and Congestion Management ProgramAutomation and ConnectivityCorporateExploratory Advanced ResearchPlanning for Bicycle and Pedestrian Safety, Connectivity, and Multimodal Mobility, including for Underserved CommunitiesPolicy Analysis and Global OutreachResearch Infrastructure, Technology Transfer, and PartnershipsSafety Program DeliverySmall Business Innovation ResearchState Transportation Innovation CouncilAccelerated Innovation DeploymentAdvanced Transp. and Congestion Management ProgramGeotechnical and HydraulicsHighway and Transportation DataModeling and Analysis ToolsSafety Design and OperationsSurface Transportation Funding AlternativesAccelerating Market ReadinessLong-Term Infrastructure Performance ProgramManaging Disruptions to OperationsPerformance Based PlanningSafety Data and AnalysisEvery Day CountsHuman Factors AnalyticsResiliencySurface Transp. Funding AlternativesTransportation Performance Management, Asset Management, and MaintenanceAccelerating Project DeliveryInnovative Program DeliveryStructuresTruck Size and WeightPavement and MaterialsTransportation Systems Management and OperationsDesignated Grant ProgramsFreight Management and OperationsHydraulicsConnected and Automated VehiclesGeotechnicalConstruction and Project ManagementCross-Topic Areas Federal and Indian LandsExploratory Advanced ResearchInfrastructureInnovative Program DeliveryOperationsPlanning, Environment, and RealtyPolicySafetySmall Business Innovation Research Activity - Any -Analysis, Modeling, and SimulationCARMACooperative Automated VehiclesData and AnalysisDevelopment of Crash Modification Factors ProgramEmergency ResponseEvaluation of Low Cost Safety Improvements Pooled Fund StudyFoundation Characterization Program (FCP)Geotechnology Research ProgramHighway Safety Improvement ProgramHighway Safety Information SystemHuman FactorsIntegrating Advanced Technologies to Actively Manage TrafficInteractive Highway Safety Design ModelIntersectionsLocal and Rural RoadsLong-Term Bridge PerformanceLong-Term Pavement PerformanceMotorcycle Crash Causation StudyNational Traffic and Road Closure InformationNaturalistic Driving Study Pooled FundPedestrian / BicycleReal-Time Traveler InformationRoadway DepartureRoadway Safety Capacity Building ProgramSafety Training and Analysis CenterSpeed ManagementSurrogate Safety Assessment Model (SSAM)Traffic Control Device Pooled FundTransportation ManagementUltra-High Performance Concrete (UHPC)Vehicle to Infrastructure Start Date Date E.g., 2022-06-25 End Date Date E.g., 2022-06-25 Project Name Project ID Status Start Date End Date Asphalt Embrittlement (Accelerated Loading Facility (ALF) Fatigue Exp.) FHWA-PROJ-11-0207 Active Thursday, September 15, 2011 Tuesday, December 15, 2020 Asphalt Mix Compaction Modeling FHWA-PROJ-12-0041 Completed Monday, June 4, 2012 Thursday, June 4, 2015 Asphalt Mixtures With Improved Oxidative Aging Resistance FHWA-PROJ-10-0094 Completed Monday, January 25, 2010 Tuesday, July 31, 2012 Asphalt Modification with Phosphoric Acid FHWA-PROJ-06-0028 Completed Tuesday, December 5, 2006 Thursday, February 20, 2014 Asphalt Pavement Embrittlement: Evaluating the Relationship Between Field and Lab Aging FHWA-PROJ-09-0035 Terminated Tuesday, September 1, 2009 Friday, August 31, 2012 Asphalt Sustainability Issues: Evaluation of Long-Term Performance of Recycled Additives, Including Recycled Motor Oil, Reclaimed Asphalt Pavements, Reclaimed Asphalt Shingles, and Bioasphalts FHWA-PROJ-09-0048 Completed Monday, September 14, 2009 Sunday, December 30, 2012 Asphalt with Improved Physical Properties FHWA-PROJ-10-0005 Terminated Monday, February 1, 2010 Saturday, December 31, 2011 Assessing the Feasibility of Deploying Partial Automation for Truck Platooning FHWA-PROJ-13-0076 Completed Friday, September 20, 2013 Saturday, March 31, 2018 Assessment of Prestressing Strand and Lightweight Concrete via the Standard Test for Strand Bond (STSB) FHWA-PROJ-10-0026 Active Monday, May 31, 2010 Wednesday, December 31, 2014 Augmenting Inductive Loop Sensor Data with Signal Phase and Timing (SPaT) and GrID (MAP) via Data Fusion, Harmonia - Phase II: Product Development (111FH2-15) FHWA-PROJ-13-0022 Completed Wednesday, January 16, 2013 Saturday, January 16, 2016 Augmenting Inductive Loop Vehicle Sensor Data with Signal Phase and Timing (SPaT) and GrID (MAP) via Data Fusion - Phase I FHWA-PROJ-13-0117 Completed Wednesday, January 16, 2013 Friday, January 16, 2015 Automated Video Processing Algorithms to Detect and Classify High-Level Behaviors with Speed and Accuracy FHWA-PROJ-19-0019 Active Friday, September 20, 2019 Saturday, March 19, 2022 Backcalculation of the Long-Term Pavement Performance Program Deflection Data FHWA-PROJ-11-0066 Completed Thursday, September 29, 2011 Tuesday, December 29, 2015 Balancing Safety and Capacity in an Adaptive Signal Control System, Phase I FHWA-PROJ-08-0022 Completed Tuesday, September 2, 2008 Friday, October 1, 2010 Balancing Safety and Capacity in an Adaptive Signal Control System, Phase II FHWA-PROJ-10-0037 Active Monday, August 9, 2010 Saturday, June 1, 2013 Behavioral Sciences Approach to Testing, Validating, and Establishing Best Practices for Alternative Highway Revenue Collection FHWA-PROJ-09-0054 Completed Wednesday, September 23, 2009 Wednesday, April 30, 2014 Behavioral-Based (or Agent-Based) National Freight Demand Modeling FHWA-PROJ-14-0133 Completed Wednesday, September 17, 2014 Sunday, May 31, 2020 Benchmarking Structural Dynamic Properties and Long Term FHWA-PROJ-12-0108 Terminated Saturday, October 1, 2011 Thursday, May 30, 2019 Benchmarking Structural Dynamic Properties and Long Term 2 FHWA-PROJ-11-0208 Completed Thursday, April 21, 2011 Thursday, May 30, 2019 Berkeley Transportation Systems - Measurement Transportation System Performance Measures Using Loop Infrastructure (102-FH2-005 10C10078) FHWA-PROJ-10-0038 Completed Tuesday, August 17, 2010 Tuesday, May 3, 2011 Pages« first ‹ previous … 2 3 4 5 6 … next › last »