Download All Research Projects in JSON Format Project Name/ID Keyword Status - Any -ActiveCompletedProgrammedProposedTemporarily SuspendedTerminated Contact Laboratory - Any -Aerodynamics LaboratoryAggregate and Petrographic LaboratoryAsphalt Binder and Mixtures Laboratory (ABML)Chemistry LaboratoryCoatings and Corrosion LaboratoryConcrete LaboratoryFederal Outdoor Impact LaboratoryGeometric Design LaboratoryGeotechnical LaboratoryHuman Factors LaboratoryIntelligent Intersection Traffic Control LaboratoryJ. Sterling Jones Hydraulics Research LaboratoryNondestructive Evaluation (NDE) LaboratoryPavement Testing FacilitySafety Training and Analysis Center (STAC)Saxton Transportation Operations LaboratoryStructures Laboratory FHWA Program Area - Any -CorporateCross-TopicDesignated Grant ProgramsExploratory Advanced ResearchFederal and Indian LandsInfrastructureInnovative Program DeliveryIntelligent Transportation SystemsOperationsPlanning, Environment, and RealtyPolicySafetySmall Business Innovation Research FHWA AMRP Program - Any -Accelerated Implementation and Deployment of Pavement TechnologiesAdvanced Transportation and Congestion Management ProgramAutomation and ConnectivityCorporateExploratory Advanced ResearchPlanning for Bicycle and Pedestrian Safety, Connectivity, and Multimodal Mobility, including for Underserved CommunitiesPolicy Analysis and Global OutreachResearch Infrastructure, Technology Transfer, and PartnershipsSafety Program DeliverySmall Business Innovation ResearchState Transportation Innovation CouncilAccelerated Innovation DeploymentAdvanced Transp. and Congestion Management ProgramGeotechnical and HydraulicsHighway and Transportation DataModeling and Analysis ToolsSafety Design and OperationsSurface Transportation Funding AlternativesAccelerating Market ReadinessLong-Term Infrastructure Performance ProgramManaging Disruptions to OperationsPerformance Based PlanningSafety Data and AnalysisEvery Day CountsHuman Factors AnalyticsResiliencySurface Transp. Funding AlternativesTransportation Performance Management, Asset Management, and MaintenanceAccelerating Project DeliveryInnovative Program DeliveryStructuresTruck Size and WeightPavement and MaterialsTransportation Systems Management and OperationsDesignated Grant ProgramsFreight Management and OperationsHydraulicsConnected and Automated VehiclesGeotechnicalConstruction and Project ManagementCross-Topic Areas Federal and Indian LandsExploratory Advanced ResearchInfrastructureInnovative Program DeliveryOperationsPlanning, Environment, and RealtyPolicySafetySmall Business Innovation Research Activity - Any -Analysis, Modeling, and SimulationCARMACooperative Automated VehiclesData and AnalysisDevelopment of Crash Modification Factors ProgramEmergency ResponseEvaluation of Low Cost Safety Improvements Pooled Fund StudyFoundation Characterization Program (FCP)Geotechnology Research ProgramHighway Safety Improvement ProgramHighway Safety Information SystemHuman FactorsIntegrating Advanced Technologies to Actively Manage TrafficInteractive Highway Safety Design ModelIntersectionsLocal and Rural RoadsLong-Term Bridge PerformanceLong-Term Pavement PerformanceMotorcycle Crash Causation StudyNational Traffic and Road Closure InformationNaturalistic Driving Study Pooled FundPedestrian / BicycleReal-Time Traveler InformationRoadway DepartureRoadway Safety Capacity Building ProgramSafety Training and Analysis CenterSpeed ManagementSurrogate Safety Assessment Model (SSAM)Traffic Control Device Pooled FundTransportation ManagementUltra-High Performance Concrete (UHPC)Vehicle to Infrastructure Start Date Date E.g., 2022-06-25 End Date Date E.g., 2022-06-25 Project Name Project ID Status Start Date End Date HRDO-FY17-Alternate Design and Performance for Locating Managed Lanes on the Right Side of Roadways II Active Tuesday, August 29, 2017 Tuesday, October 27, 2020 Development and Application of a Disaggregate Artificial Realistic Data Generator for Computationally Testing Safety Analysis Methods FHWA-PROJ-19-0014 Active Friday, August 23, 2019 Monday, August 22, 2022 Develop the Next-Generation Design Tools for Bridge Scour, Stream Stability and Scour Protection/Countermeasures FHWA-PROJ-19-0004 Active Monday, October 1, 2018 Monday, September 30, 2024 STOL O&M FHWA-PROJ-16-0043 Active Thursday, August 25, 2016 Thursday, October 29, 2020 Evaluation of Low Cost Safety Improvements Transportation Pooled Fund Study (ELCSI–PFS) (8 Project Titles) FHWA-PROJ-05-0011 Active Monday, March 7, 2005 Wednesday, December 31, 2025 Industry Mergers and Acquisitions Impacts on the Cost and Quality of Highway Construction FHWA-PROJ-17-0003 Active Wednesday, February 8, 2017 Wednesday, April 21, 2021 Implementation of Jointed Plain Concrete Pavements Performance-Related Specifications by State Highway Agencies FHWA-PROJ-08-0043 Active Wednesday, October 1, 2008 Wednesday, April 30, 2014 Maintenance and Data Services for Long-Term Pavement Performance (LTPP) Weigh-in-Motion (WIM) Systems FHWA-PROJ-04-0002 Active Thursday, September 22, 2011 Monday, September 21, 2015 Asphalt Embrittlement (Accelerated Loading Facility (ALF) Fatigue Exp.) FHWA-PROJ-11-0207 Active Thursday, September 15, 2011 Tuesday, December 15, 2020 Pedestrian Crash Modification Factors (CMFs) Study FHWA-PROJ-14-0067 Active Monday, July 28, 2014 Thursday, March 30, 2017 TechBrief: Construction Quality Assurance for Design-Build Highway Projects FHWA-PROJ-10-0067 Active Monday, November 1, 2010 Friday, April 27, 2012 Long-Term Pavement Performance Data Collection Activities Fugro FHWA-PROJ-06-0005 Active Saturday, July 1, 2006 Saturday, December 31, 2011 Independent Evaluation - Truck Platooning Early Deployment Assessment, Phase II FHWA-PROJ-20-0005 Active Monday, July 27, 2020 Saturday, March 26, 2022 HRDO-FY16-12 Preliminary Interaction Between Heavy and Light Vehicles at Level 1 CAV II FHWA-PROJ-16-0028 Active Thursday, September 22, 2016 Thursday, December 10, 2020 Hydration Kinetics of High-Volume Fly Ash Mixtures for Concrete Paving Applications FHWA-PROJ-14-0005 Active Monday, March 3, 2014 Thursday, December 31, 2020 Applying Predictive Analytics to Real-time Operation of TMSs FHWA-PROJ-20-0004 Active Wednesday, July 15, 2020 Thursday, October 14, 2021 Mobility Portal and DMA Policies FHWA-PROJ-15-0009 Active Wednesday, September 23, 2015 Friday, November 20, 2020 Connected Vehicles Pooled Fund Study FHWA-PROJ-09-0015 Active Sunday, May 31, 2009 Thursday, July 30, 2015 Preservation Guidelines FHWA-PROJ-08-0032 Active Friday, September 12, 2008 Tuesday, September 30, 2014 Fiber-Reinforced Polymer (FRP) Applications in Hazard Mitigations (Seismic, Blast, Impact, etc.) FHWA-PROJ-13-0014 Active Thursday, January 31, 2013 Sunday, July 12, 2015 Pages1 2 3 4 5 … next › last »